Changcheng No.6 Coal Mine
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Changcheng No.6 Coal Mine (鄂托克前旗长城六号矿业有限公司长城六号煤矿) is located in Otog Front Banner, Erdos City, Inner Mongolia Autonomous Region, and it has a production capacity of 1.5 million tons (Mt) per year.
Contents
Location
The undated satellite photo below shows the coal mine located in Shanghaimiao Town, Otog Front Banner, Erdos City, Inner Mongolia Autonomous Region, China.
Coal Mine Background
In March 2019, the construction of Changcheng No.6 Coal Mine in Shanghaimiao Mining Area was approved by the National Energy Administration. The production capacity of it is designed to be 1.5 million tons/year.[1]
Project Details
- Sponsor: Otog Front Banner Changcheng No.6 Mining Co.
- Parent Company: Shandong Energy(43.34%), State Grid Corporation of China(12.26%), Inner Mongolia Shuangxin Energy Chemical Co.(28.72%), Beijing Huirong Shengjing Equity Investment Fund Management Center(3.69%), Ordos Antel Investment Co.(3.2%), Huarong West Development & Investment Co.(2.98%), others(13.46%)
- Location: Shanghaimiao Town, Otog Front Banner, Erdos City, Inner Mongolia Autonomous Region, China
- GPS Coordinates: 38.299084,106.53429
- Status: Construction
- Production Capacity: 1.5 Mt/year
- Total Resource: 135Mt[2]
- Minable Reserves: 97.75Mt
- Coal Type: Bituminous (gas coal)
- Mine Size: 8.12k㎡
- Mine Type: Underground
- Start Year:
- Source of Financing:
Articles and resources
References
- ↑ "国家能源局关于内蒙古上海庙矿区长城六号煤矿项目核准的批复"国家能源局,2019/03/08
- ↑ "内蒙古上海庙矿区长城六号煤矿新建工程环境影响报告书"生态环境部,2017/01