Chengde Shangbancheng power station (建投能源承德上板城热电项目) is a 700-megawatt (MW) coal-fired power station in Hebei Province, China.
Contents
Location
The undated satellite photo below shows the plant in Shangbancheng Baihenan Village, in the Economic Development District of Chengde.
Background on Project
Hebei Construction Investment Energy Investment Co. has proposed a power station of 700 MW in the High-Tech Industrial Park area of Chengde City, Hebei Province. It would be supercritical and fueled by domestic lignite coal.[1]
A pre-feasibility study was submitted for public comment in 2014.[2] The power station is under construction,[3] and planned for operation by 2017.[4]
The power station began operating in 2017.[5]
Project Details
- Sponsor: Hebei Construction Energy Investment Company
- Parent company: Hebei Construction & Investment Group
- Location: Shangbancheng Baihenan Village, Economic Development District, Chengde Prefecture, Hebei Province, China
- Coordinates: 40.803641, 118.061371 (exact)
- Status: Operating
- Gross capacity: 700 MW (Units 1&2: 350 MW)
- Type: Supercritical
- Start date: 2017
- Coal type: Lignite
- Coal source: Domestic
- Source of financing:
Articles and resources
References
- ↑ "河北部署2015年煤电," 中国能源报, 2015年02月16日
- ↑ "承德上板城热电厂工程环境影响评价第一次公众参与信息公示," Chengde EPA, 2014-4-2
- ↑ "河北建投承德上板城2×350MW超临界热电联产工程1号机组锅炉蒸汽吹管调试工作圆满结束," 2016-12-27
- ↑ "河北建投能源投资股份有限公司(2015届毕业生)春季招聘信息," 2015-03-26
- ↑ "中国能建承建河北承德上板城热电联产工程2号机组通过168," 安徽电建一公司, 2017-09-30