Chongqing Shizhu power station (大唐国际石柱发电公司) is a 700-megawatt (MW) coal-fired power plant in Chongqing DC Municipality, China.
Contents
Location
The map below shows the location of the plant, near Xituo Town, Shizhu Tuija Autonomous County, Chongqing Municipality.
Loading map...
Background on Project
China Datang is currently building a two-unit coal-fired power plant with a total planned capacity of 700 MW in Chongqing Province. One unit was completed earlier in 2014, and the second was completed by the end of 2014.[1] [2]
Project Details
- Sponsor: Datang Intl Power Generational Co.,Ltd
- Parent Company: Datang
- Location: Xituo Town, Shizhu Tuija Autonomous County, Chongqing Municipality, China
- Coordinates: 30.3899703,108.2202055 (exact)
- Status: Operating
- Gross capacity: 700 MW (Units 1 & 2: 350 MW)
- Type: Supercritical
- In service: 2014
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ “公司承建的大唐国际重庆石柱发电厂新建工程1号机组并网发电一次成功,” 中国电建2014-05-12
- ↑ "重庆大唐国际石柱发电有限责任公司"China Datang Corp