Composite Power Project
Jump to navigation
Jump to search
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
In January 2002, Composite Power leased the site of an uncompleted nuclear reactor in Richland, planning to build a power plant. [1] The plant was listed in the May 2007 NETL survey as a 2500 coal plant. [2] The project has not been pursued.[3]
Contents
Project Details
Sponsor: Composite Power
Location: Richland, Washington
Capacity: 2500 megawatts (MW)
Status: Abandoned
Financing
Citizen Groups
Resources
References
- ↑ “Composite Power Signs Long-Term Lease with DOE for Power Plant Site,” Power Engineering International, January 28, 2002
- ↑ "Tracking New Coal-Fired Power Plants: Coal's Resurgence in Electric Power Generation", National Energy Technology Lab, May 1, 2007, page 21. (Pdf)
- ↑ "Stopping the Coal Rush", Sierra Club, accessed January 2008. (This is a Sierra Club list of new coal plant proposals.)
Related SourceWatch Articles
- Washington (state) and coal
- United States and coal
- Carbon Capture and Storage
- Existing U.S. Coal Plants
- US proposed coal plants (both active and cancelled)
- Coal plants cancelled in 2007
- Coal plants cancelled in 2008
- State-by-state guide to information on coal in the United States (or click on the map)
<us_map redirect="{state} and coal"></us_map>