Datang Suihua power station
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Datang Suihua power station (大唐绥化热电公司) is a 700-megawatt (MW) coal-fired power plant in Heilongjiang Province, China.
Contents
Location
The map below shows the location of the plant in Dongfu Town, Beilin District.
Background on Project
China Datang is developing a two-unit coal-fired power plant with a total planned capacity of 700 MW in Liaoning Province. The plant was approved by the National Development and Reform Commission for construction in June 2015.[1][2] Tenders for construction began in June 2015.[3] Unit 1 began the commissioning stage in October 2017.[4]
Both units were commissioned in December 2017.[5][6]
Project Details
- Sponsor: Datang Heilongjiang Power Generation Co
- Parent company: China Datang
- Location: Dongfu Town, Beilin District, Suihua Prefecture, Heilongjiang Province, China
- Coordinates: 46.658416, 127.035146 (exact)
- Status: Operating
- Gross capacity: 700 MW (Units 1 & 2: 350 MW)
- Type: Supercritical
- Start year: 2017
- Coal type: Lignite
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "大唐黑龙江公司绥化热电新建工程项目获核准", 北极星电力网, 2014-08-11
- ↑ "五大发电等1-9月获核准的29个火电项目情况," Sieyuan, 2014-1-10
- ↑ "唐绥化热电2×350MW超临界供热机组新建工程第三批辅机设备招标公告[变更," 中国采购与招标网, 2015-06-18
- ↑ "大唐绥化热电新建工程1号机组启动通过验收," suihua.dbw.cn, 2017-10-21
- ↑ "大唐绥化热电公司1号机组正式投产发电," China 5e, 2017-12-05
- ↑ "大唐绥化热电公司2号机组通过试运行," East Day, 2018-01-02