Derby Export Facility
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of Western Australia and coal | |
Sub-articles: | |
| |
Related articles: | |
Derby Export Facility is a proposed coal export port by Rey Resources in Derby, Western Australia.
The facility would export 2.5 million tonnes of coal a year from Rey Resources' proposed Duchess Paradise Project, which would be the first coal mine in Western Australia's Kimberley region. As of January 2018, the project appears to be on hold, awaiting environmental permits and an improvement in global coal markets.
Contents
Location
The project would use the existing Derby Export Facility at the Port of Derby, which was used by the previous operator for lead and zinc exports. Rey Resources took over the Derby Export Facility sublease in 2009.[1]
Project Details
- Sponsor: Rey Resources
- Location: Derby, Western Australia
- Annual Capacity (Tonnes): 2.5 million (proposed)
- Status: Proposed
- Projected in service:
- Type: Exports
- Coal sources: the proposed Duchess Paradise Project in Western Australia's Kimberley region
- Cost:
- Financing:
Background
In 2009 Rey Resources took over the lease on the Derby Export Facility, which had previously been used to export lead and zinc sulphide concentrate exports from mines east of Fitzroy Crossing. Rey Resources states that, with the approval of Department of Environment Conservation, it will remediate the site. The company is proposing to transport coal by truck approximately 140 kilometres to the Derby Export Facility, where it would be deposited into a 70,000 tonne stockpile, sent via a conveyor to a barge loader and then to barges capable of carrying 8,500 tonnes each. The company then proposes that the barges be towed approximately 12 nautical miles to an existing vessel mooring point in King Sound. The company proposes that a 55,000 tonne vessel could be loaded in two days.[2]
As of January 2015, the Rey Resources website states that "the Duchess Paradise Project is in the advanced stages of environmental assessment at the level of Public Environmental Review (PER). During a challenging period in coal markets Rey intends to continue the processes of securing Project environmental approvals."[3] The website includes links to several documents from the environmental review process, dated between 2010 and 2013.[4]
In 2016 it was reported that Rey Resources had applied for a license to build its Duchess Paradise Project coal mine 200 kilometres south-east of Derby near the Fitzroy River. The Environmental Protection Authority has determined that the Duchess Paradise Project shall be assessed at the level of Public Environmental Review. The project has been challenged on the grounds that the Fitzroy River forms part of one of the largest networks of unregulated tropical rivers in the world and has unique cultural and wilderness values.[5]
Articles and resources
References
- ↑ "Derby Export Facility Remediation," Rey Resources, accessed March 2018
- ↑ Rey Resources, Duchess Paradise Project: Environmental Referral: Supporting Documentation, June 9, 2011, pages 46-47. (Pdf)
- ↑ "Coal", Rey Resources website, accessed January 2015. (Pdf)
- ↑ "Public Environmental Review", Rey Resources website, accessed January 2015. (Pdf)
- ↑ Renewsletter Vol. 22, No. 2, Environmental Defender's Office WA, Jan 10, 2017
Related SourceWatch articles
External resources
- Rey Resources, "Derby Export Facility Remediation", Rey Resources website, June 2011.