Fushun Zhongji power station (抚顺矿业中机热电公司) is a 600-megawatt (MW) waste coal-fired power plant in Liaoning Province, China.
Contents
Location
The undated satellite photo below shows the plant in Fushun Prefecture.
Background on Project
Fushun Mining Group and Sinomach are sponsors of a two-unit waste coal-fired power plant with a total planned capacity of 600 MW in Liaoning Province. The plant is scheduled to be completed in 2015.[1]
The plant received environmental clearance at the end of 2014.[2] As of 2015 the project is still seeking a NDRC permit for construction.[3]
Unit 1 was commissioned in March 2017.[4][5] Unit 2 was commissioned in July 2017.[6]
Although the plant is operating, there is no record that the plant received the necessary permits for construction.
Project Details
- Sponsor: Fushun Mining Group (51%), Sinomach (49%)
- Location: Yanwu Street, Wanghua, Fushun Prefecture, Liaoning Province, China
- Coordinates: 41.819307, 123.8300555 (exact)
- Status: Operating
- Gross capacity: 600 MW (Units 1 & 2: 300 MW)
- Type: Subcritical
- Start year: 2017
- Coal type: Bituminous waste coal
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "抚顺矿业中机热电有限责任公司", 抚顺矿业中机热电有限责任公司网站
- ↑ "抚辽宁抚顺热电厂“上大压小”新建项目环境影响报告书已获得国家环保部批复," 2014-12-31
- ↑ "抚顺市重大项目情况汇总," Fushun Development and Reform Commission, 2015-7-17
- ↑ "辽宁抚顺热电厂2台30万千瓦“上大压小”新建工程1号机组投产," 2017-3-16
- ↑ "抚热电2×300兆瓦工程2号机组一次并网成功," 2017-4-12
- ↑ "公司承建的抚顺热电厂2号机组顺利通过168小时试运行," CEEC, 2017-07-28