Gaojiabao Coal Mine
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Gaojiabao Coal Mine (陕西正通煤业有限责任公司高家堡煤矿) is one of the 13 mines located in Binchang Mining Area in Shaanxi Province. The annual production capacity of it is designed to be 5 million tonnes(Mt) a year.[1]
Contents
Location
The undated satellite photo below shows the coal mine located in Qiyuhe Village, Penggong Town, Changwu County, Xianyang, Shaanxi.
Coal Mine Background
In August 2013, the National Development and Reform Commission (NDRC) has ratified the construction of Gaojiabao Coal Mine Binchang Mining Area of Shaanxi Province with a production capacity of 5Mt per year.[2]
In April 2016, it was approved by the Coal production Safety Supervision Bureau in Shaanxi Province to commence the experimental operation. [3]
Project Details
- Sponsor: Shaanxi Zhengtong Coal Industry Co.
- Parent Company: Shandong Energy Group
- Location: Qiyuhe Village, Penggong Town, Changwu County, Xianyang, Shaanxi
- GPS Coordinates: 35.268672,107.818112
- Status: Construction
- Production Capacity: 5 Mt/year
- Total Resource: 970Mt[4]
- Minable Reserves: 470Mt
- Coal Type: Bituminous
- Mine Size: 219.16k㎡[5]
- Mine Type: Underground
- Start Year:
- Source of Financing:
Articles and resources
References
- ↑ "正通概况"山东能源淄矿正通煤业 , 2017/11/02
- ↑ "陕西彬长矿区高家堡煤矿项目通过核准"发改委, 2013/08/27
- ↑ "陕西正通煤业有限责任公司高家堡矿井及选煤厂新建项目网上信息公开"陕西煤矿安全监察局,2016/06/13
- ↑ "山东能源淄矿集团高家堡矿井及选煤厂项目档案正式通过国家档案局专项验收"陕西麦迪档案管理服务有限公司, 2017/04/17
- ↑ "关于陕西正通煤业有限责任公司高家堡矿井排水方案调整的复函"陕西省环境保护厅, 2016/10/21