Ghana 1000 power station
Part of the Global Gas Plant Tracker, a Global Energy Monitor and Center for Media and Democracy project. |
Ghana 1000 power station is a proposed 1,300-megawatt (MW) gas-fired power plant in Aboadze near Takoradi in Western Region, Ghana.[1] It is also known as Ghana 1000 gas-to-power project.
As of December 2019, the project has not progressed in more than two years and appears to be shelved.
Location
The map below shows the exact location of the proposed power station in Aboadze near Takoradi, Western Region, Ghana.[2]
Background
General Electric (GE), Endeavor Energy and Finagestion initially signed an agreement to build the plant in May 2014[3] and GE announced the Ghana 1000 Power Project at the beginning of 2015.[4]
The project will include gas infrastructure as well:
- "The Project will include a combined cycle gas turbine power plant (CCGT), liquified natural gas import infrastructure in the form of a floating storage and regasification unit (“FSRU”) and gas pipeline from the FSRU to the power plant."[2]
According to Endeavor Energy:
- "Ghana 1000 is in an advanced stage of development having completed negotiations and initialed its power purchase agreement with ECG, received PURC approval of its power tariff, secured its site, obtained an approved Environmental and Social Impact Assessment, and is prepared to enter into an EPC contract with a globally reputable firm having completed its EPC tender process."[1]
In March 2017, Interfax Natural Gas Daily reported that the project would be delayed until at least 2018.[5] Later in 2017, the news outlet reported the project might be axed because Ghana's grid can't handle the load.[6]
In early 2019, the project was still stalled.[7]
Project Details
- Sponsor: Endeavor Energy, GE Power, Sage Petroleum, Eranove
- Parent company: Denham Capital
- Location: Aboadze, Takoradi, Western Region, Ghana[8]
- Coordinates: 4.9728091, -1.6588022 (exact)[2]
- Gross capacity (proposed): 1,300 MW[1]
- Phase 1a: 125 MW initially (no start date)[9]
- Gas turbine unit 1: 125 MW
- Phase 1a: 250 MW (finishes combined cycle unit in Phase 1a) (no start date)
- Gas turbine unit:
- Steam turbine unit:
- Phase 1b: 375 MW (no start date)
- Gas turbine units 1-2:
- Steam turbine unit 1:
- Phase 2: 550 MW
- Gas turbine units 1-3:
- Steam turbine unit 1:
- Phase 1a: 125 MW initially (no start date)[9]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 Ghana 1000 Gas-to-Power Project, Endeavor website, accessed Dec 12, 2019
- ↑ 2.0 2.1 2.2 Ghana 1000 Gas to Power Project, Sage Petroleum website, Nov 7, 2014
- ↑ Ghana 1,000 MW gas to power project, ESI Africa, May 15, 2014
- ↑ Tildy Bayar, GE to build 1200 MW gas-fired power plant in Ghana, Power Engineering International, Jan 28, 2015
- ↑ Miriam Malek, Ghana 1000 construction delayed until 2018,Interfax Global Energy, Mar 10, 2017
- ↑ Miriam Malek, Ghana 1000 gas-to-power project could be axed, Interfax Global Energy, Sep 29, 2017
- ↑ Daniel Marks, LNG-to-power a hard nut to crack in Africa, Petroleum Economist, Jan 2019
- ↑ Ghana 1000 Project, Sage Petroleum website, accessed Dec 12, 2019
- ↑ Ghana 1000 Consortium and Shell Enter into Exclusive Negotiations for LNG Supply to the Ghana 1000 Power Project, Denham Capital website, Mar 9, 2015