Guangzhou Wanglong Cogen power station ( 广州旺隆热电, also known as First phase of Guangzhou Xintang Cogen power station, 广州新塘热电一期 ) is a retired 200-megawatt (MW) coal-fired power plant in Guangdong Province, China.
Contents
Location
The map below shows the location of the plant, at Xintang Town, Zengcheng.
Background on Plant
Guangzhou Wanglong Cogen is a 2 x 100 MW subcritical co-generation coal plant commissioned in 2005.[1] It also supplies heat and steam to the enterprises in the nearby Xiapu Ecologic Development Zone.[2]
The units are planned for retirement before 2020.[3]
The two units were retired in 2018.[4]
Plant Details
- Sponsor: Guangzhou Power Enterprise Group
- Parent company: Guangzhou Development Group
- Location: Xintang Town, Zengcheng, Guangzhou Prefecture, Guangdong Province, China
- Coordinates: 23.092949, 113.564794 (exact)
- Status: Retired (2018)
- Gross capacity: 200 MW (Units 1 & 2: 100 MW)
- Type: Subcritical
- In service: 2005
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "关于广州新塘漂染工业环境保护综合治理项目热电联产电站一期(2×100兆瓦)工程竣工环境保护验收合格的函"MEPC, 2014-03-13
- ↑ "广州市旺隆热电有限公司简介," hdjob.bjx.com.cn, accessed Oct 2016
- ↑ "广东:全省不再新建煤电项目 关停广州发电厂等315.5万千瓦燃煤发电机组," 北极星电力网, 2018/7/27