Heilongjiang Hegang Mining power station
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Heilongjiang Hegang Mining power station (龙煤鹤岗电厂) is a 150-megawatt (MW) coal-fired power plant in Heilongjiang Province, China.
An additional 700 MW has been proposed.
Contents
Location
The undated satellite photo below shows the plant in Hegang Prefecture.
Background on Plant
The four existing coal-fired units of Heilongjiang Hegang Mining power station, totaling 150 MW, were brought online between 1992 and 2009. The plant is owned by Heilongjiang Hegang Mining.
Expansion
In 2011 the company said it planned to expand the plant by one 200 MW unit.[1][2][3]
However, that plan was later abandoned for a 2 x 350 MW residential CHP expansion, which was permitted in July 2016. The two new supercritical units will replace the older subcritical units when commissioned.[4] The expansion units will be fired by waste coal.[5]
2016-2017: Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
Due to new restrictions announced during 2016-2017 by the National Energy Administration and the National Development and Reform Commission, further capacity expansions at this location may be on hold or cancelled.
Specifically, guidelines issued on October 10, 2016 (NEA Electricity [2016] 275) suspends construction that began in 2016 or later to all provinces that have been issued a "red light" under the country's traffic light system, which includes Heilongjiang.
For details, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.
According to the Heilongjiang government, the project is postponed.[6]
Project Details
- Sponsor: Heilongjiang Hegang Mining
- Parent company: Heilongjiang Longmay Mining Group
- Location: 17 Changnan Road, Gongnong District, Hegang Prefecture, Heilongjiang Province, China
- Coordinates: 47.235641, 130.22467 (exact)
- Status: operating
- Gross capacity: 150 MW (Units 1&2: 25 MW, Units 3&4: 50 MW)
- Type: Supercritical
- Projected in service: 1992-2009
- Coal type: Waste coal
- Coal source:
- Source of financing:
Project Details for Expansion
- Sponsor: Heilongjiang Hegang Mining
- Parent company: Heilongjiang Longmay Mining Group
- Location: 17 Changnan Road, Gongnong District, Hegang Prefecture, Heilongjiang Province, China
- Coordinates: 47.235641, 130.22467 (exact)
- Status: Shelved
- Gross capacity: 700 MW (Units 5&6: 350 MW)
- Type: Supercritical
- Projected in service:
- Coal type: Waste coal
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "关于龙煤鹤岗二期1×200MW煤矸石综合利用电厂扩建工程项目核准的请示", 黑龙江发展和改革委员会, 2011-07-06
- ↑ "2012年政府工作报告", 鹤岗市政府网站, 2012-01-19
- ↑ "积极加快项目开发 推进产业结构调整", 鹤岗市政府网站, 2012-01-05
- ↑ "黑龙江龙煤鹤岗矿业“上大压小”热电联产新建项目获批," 北极星电力网, 2016/7/4
- ↑ "黑龙江龙煤鹤岗矿业有限责任公司热电厂“上大压小”热电联产(2×350MW)煤矸石综合利用工程环境影响评价公众参与第一次公示"EPA of Hegang, 2015/3/13
- ↑ "关于印发《黑龙江省2017年煤电有序发展实施细则》的通知," Heilongjiang Province government, Nov 10, 2017