Hejiata Coal Mine
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Hejiata Coal Mine (陕西省何家塔煤矿) is located within the Shenfu Coalfield in Shaanxi Province, one of the eight largest coal fields in the world. The annual production capacity of it is designed to be 1.2 million tonnes(Mt) per year and will be expanded to 3 Mt/year in the future.[1]
Contents
Location
The undated satellite photo below shows the coal mine located in Hejiata Village, Daliuta Town, Shenmu,Yulin, Shaanxi Province, China.
Coal Mine Background
In 1993, the Hejiata Coal Mine in Shaanxi Province was approved by the National Development and Reform Commission and was listed as a state-owned key large-scale coal mine.[2]
In October 2018, the construction of Hejiata Coal Mine successfully passed the completion acceptance.[3]
Project Details
- Sponsor: Ministry of Justice of the People's Republic of China
- Parent Company: Ministry of Justice of PRC
- Location: Hejiata Village, Daliuta Town, Shenmu,Yulin, Shaanxi Province, China
- GPS Coordinates: 39.169374,110.355952
- Status: Operating
- Production Capacity: 1.2 Mt/year
- Total Resource: 243Mt[4]
- Minable Reserves: 150Mt
- Coal Type: Bituminous(long flame coal, non-caking coal)[5]
- Mine Size: 41.7246k㎡[6]
- Mine Type: Underground
- Start Year: 2018
- Source of Financing:
Articles and resources
References
- ↑ "陕西省何家塔煤矿" 和谐陕西网,2014/11/13
- ↑ "陕西省何家塔煤矿" 和谐陕西网,2014/11/13
- ↑ "陕西省何家塔煤矿建设项目(5-2煤系统)顺利通过竣工验收 " 陕西榆林能源集团有限公司,2018/10/12
- ↑ "陕西省何家塔煤矿简介" 央视网,2011/11/23
- ↑ "伟大历程·陕西足迹 神府特大煤田轰动世界"新浪陕西,2018/06/21
- ↑ "关于陕西省何家塔煤矿建设工程生态环境治理方案审查意见的函"陕西省生态环境厅,2016/02/06