Hetaoyu Coal Mine
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Hetaoyu Coal Mine (华能甘肃能源开发有限公司核桃峪煤矿) is a permitted coal mine with an annual production capacity of 8 million tonnes(Mt) located in the Southwest of Zhengning County, Gansu Province. It is the major mine of Zhengning coalfield developed by China Huaneng Gansu Energy Development Co.
Contents
Location
The undated satellite photo below shows the coal mine located in Southwest of Zhengning County, Qingyang, Gansu Province
Coal Mine Background
In Feb.2011, the National Development and Reform Commission (NDRC) has ratified the construction of Hetaoyu Coal Mine with 8 Mt of annual production capacity. [2]
Currently, this coal mine is still under construction.[3]
Project Details
- Sponsor: China Huaneng Gansu Energy Development Co.
- Parent Company: China Huaneng
- Location: Southwest of Zhengning County, Qingyang, Gansu Province
- GPS Coordinates: 35.269947,107.946376
- Status: Construction
- Annual Production Capacity: 8 Mt/year
- Total Resources: 2,082.03Mt [4]
- Minable Reserves: 1,229.53 Mt
- Coal Type: Bituminous
- Mine Size: 183.2 k㎡ [5]
- Mine Type: Underground
- Start Year:
- Source of Financing:
Articles and resources
References
- ↑ "庆阳:项目建设成为转型跨越的引擎"甘肃省人民政府, 2012/10/12
- ↑ "甘肃宁正矿区核桃峪矿井及选煤厂项目通过核准"发改委, 2011/02/28
- ↑ "华能千万吨煤电项目筹建十年仍未投产 千亩土地撂荒"凤凰网咨询, 2018/03/24
- ↑ "华能庆阳煤电有限责任公司核桃峪煤矿"庆阳市科学技术协会, 2017/01/12
- ↑ "核桃峪矿井及选煤厂水土保持方案变更报告书技术评审意见的报告"水利部, 2018/09/21