Hoa Dau Long Son power station
Jump to navigation
Jump to search
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of Vietnam and coal | |
Sub-articles: | |
Related articles: | |
Hóa dầu Long Sơn power station was a proposed 225-megawatt (MW) coal plant in Vũng Tàu province, Vietnam.
In March 2019 it was reported the plant will be gas-fired.
Contents
Location
The map below shows the location of Phú Mỹ, Vũng Tàu province, where the plant would be built.
Loading map...
Background
The project is listed in Revised Power Development Plant VII for the period 2016-2030. It is planned for 2017-2018, although an investor has not yet been identified.[1]
In March 2019 it was reported the plant will be gas-fired.[2]
Project Details
- Sponsor: Hoa Dau Long Son Limited Company
- Parent company:
- Location: Phú Mỹ, Vũng Tàu province,, Vietnam
- Coordinates: 10.590556, 107.048056 (approximate)
- Status: Cancelled
- Gross Capacity: 225 MW (3 x 75 MW)
- Type:
- Projected in service:
- Coal Type:
- Coal Source:
- Source of financing:
Articles and resources
References
- ↑ DANH MỤC CÁC DỰ ÁN NGUỒN ĐIỆN VÀO VẬN HÀNH GIAI ĐOẠN 2016 - 2030, Ban hành kèm theo Quyết định số 428/QĐ-TTg ngày 18 tháng 3 năm 2016 của Thủ tướng Chính phủ (LIST OF POWER PROJECT IN OPERATION PERIOD 2016 - 2030, Issued together with Decision No. 428 / QD - TTg of March 18, 2016 by the Prime Minister)
- ↑ "Tổ hợp hóa dầu Long Sơn," Baodautu.vn, Mar 12, 2019