Hongqingliang Coal Mine
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Hongqingliang Coal Mine (杭锦旗西部能源开发有限公司红庆梁煤矿) is located within the Taran Gaole Mining Area of Inner Mongolia, China. Its annual production capacity is designed to be 6 million tonnes(Mt) a year.
Contents
Location
The undated satellite photo below shows the coal mine located in Zhaojun Town, Dalad, Ordos, Inner Mongolia
Coal Mine Background
In July 2015, the National Development and Reform Commission (NDRC) has ratified the construction of Hongqingliang Coal Mine located in Taran Gaole Mining Area, with a total production capacity of 6Mt/year.[1]
The construction of the principal part of the project started since May 2012 and completed until June 2018. [2] In the same year, the Hongqinghe Coal Mine entered into the phase of experimental operation.[3]
Project Details
- Sponsor: Hangjinqi West Energy Development Co.
- Parent Company: Shanxi Zhongbo Real Estate Development Co (40%), Beijing Energy Group(37.38%),Shougang Group(1.12%),China Coal (1.12%), others(20.38%)
- Location: Zhaojun Town, Dalad, Ordos, Inner Mongolia
- GPS Coordinates: 39.875788,109.367767
- Status: Constructing
- Production Capacity: 6 Mt/year
- Total Resources: 1312.55Mt[4]
- Minable Reserves: 810.28Mt
- Coal Type: Bituminous
- Mine Size: 48.58k㎡
- Mine Type: Underground
- Start Year:
- Source of Financing:
Articles and resources
References
- ↑ "内蒙古塔然高勒矿区红庆梁煤矿项目通过核准"发改委, 2015/07/07
- ↑ "内蒙古塔然高勒矿区红庆梁矿井及选煤厂项目水土保持设施验收"北京昊华能源股份有限公司 , 2018/08/28
- ↑ [http://vip.stock.finance.sina.com.cn/corp/view/vCB_AllBulletinDetail.php?stockid=601101&id=4335152"昊华能源关于红庆梁矿井及选煤厂建设项目进行联合试运转的公告, 2018/04/26
- ↑ "内蒙古塔然高勒矿区红庆梁矿井及选煤厂项目水土保持设施验收"北京昊华能源股份有限公司 , 2018/08/28