Huadian Jiangling power station

From SourceWatch
Jump to navigation Jump to search

Huadian Jiangling power station (华电江陵电厂一期) is a 1,320-megawatt (MW) coal-fired power plant in Hubei Province, China.

An additional 2,000 MW is proposed but postponed for after 2020.

Location

The undated satellite photo below shows the power station in Majiazhai Town, Jiangling District, Jingzhou Prefecture, Hubei Province.

Loading map...

Background on Project

In 2013 China Huadian said it was planning to build a four-unit coal-fired power plant with a total planned capacity of 3,320 MW in Hubei Province.[1]

Units 1 & 2

The first two 660 MW units of the plant were initially scheduled to begin construction in 2014.[2][3]

The two units were permitted for construction in June 2015,[4] and began construction in September 2015. They are planned for completion in 2017.[5]

Unit 1 was commissioned on December 31, 2017.[6]

July 2017: Unit 2 postponed by government

In July 2017, the NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[7]

Huadian Jiangling power station Unit 2 is among the postponed coal-burning units,[7] and also appeared on an updated list of postponed projects released in September 2017.[8]

August 2018: Unit 2 commissioned

Unit 2 was commissioned in August 2018.[9]

Units 3 & 4

2016: Units 3-4 Shelved by Nationwide Restrictions

Due to new restrictions announced during 2016 by the National Energy Administration and the National Development and Reform Commission, further capacity expansions at this location appear to be on hold or cancelled.

For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.

Project Details

  • Sponsor: China Huadian
  • Location: Majiazhai Town, Jiangling County, Jingzhou Prefecture, Hubei Province, China
  • Coordinates: 30.091187, 112.310588 (exact)
  • Status:
    • Units 1 & 2: Operating
    • Units 3 & 4: Cancelled
  • Gross capacity: 3,320 MW (Units 1 & 2: 660 MW; Units 3 & 4: 1,000 MW)
  • Type: Ultra-Supercritical
  • Start date: 2017 (Unit 1), 2018 (Unit 2)
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and resources

References

Related SourceWatch articles