Huadian Jurong power station
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
The Huadian Jurong (Gourong) power station (华电句容发电厂) is a 4,000-megawatt (MW) coal-fired power station in Jiangsu province, China.
Contents
Location
The map below shows the location of the plant, in Jurong City, Zhenjiang Prefecture, Jiangsu Province.
Background on Plant
The first two 1,000 MW units of the power station by China Huadian went into operation in 2013.[1]
Expansion
Two additional units of 1000 MW each began development in 2014.[2][3]
The project was permitted in July 2015 and then began construction.[4]
Unit 3 was commissioned in December 2018.[5] Unit 4 was commissioned in May 2019.[6]
Unit 4 was listed as an emergency back-up unit in February 2019, before completing its 168-hour trial operation in May 2019. Soon after it went from emergency back-up power to full commercial generation, in August 2019.[7]
Project Details
- Sponsor: China Huadian
- Location: Jurong City, Zhenjiang City, Jiangsu Province, China
- Coordinates: 32.19575, 119.2497 (exact)
- Status: Operating
- Start year: 2013 (Units 1-2); 2018 (Unit 3); 2019 (Unit 4)
- Gross capacity: 4,000 MW (Units 1-4: 1,000 MW)
- Type: Ultra-supercritical
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "华电句容电厂一期实现“双投”," jrxf.gov, November 1, 2013
- ↑ "2015年6月2日拟对建设项目环评文件作出审批意见的公告," Environmental Protection Department of Jiangsu Province, 2015/6/2
- ↑ "江苏省2014年度火电项目优选评议结果公示(名单), Polaris power grid News, 2014/10/22
- ↑ "江苏电建一公司承建华电句容二期百万机组项目高水平开工," June 19, 2016
- ↑ "多项指标国内最优!华电又一新机组正式投产发电," 北极星电力新闻网, Dec 16, 2018
- ↑ "江苏华电句容二期4号机组通过168试运行," ChinaPower, 2019-05-15
- ↑ "句电公司4号机组正式投入商业运营," www.chd.com.cn, 2019-08-29