Huadian Laizhou power station (华电国际莱州发电公司二期) is a 4,078-megawatt (MW) coal-fired power plant in Shandong Province, China.
Contents
Location
The undated satellite photo below shows the plant in Yantai Prefecture, Shandong Province.
Background on Plant
The first two coal-fired units of Huadian Laizhou power station, totaling 2,078 MW, were brought online in 2012. The plant is majority-owned by China Huadian.[1]
Description of Expansion
Huadian is currently planning to build two additional coal-fired units at this plant, with a total planned capacity of 2,000 MW.[2] The company hopes to have the units approved and under construction by the end of 2014.[3] The two units were permitted in 2015.[4] Construction began in 2016.[5]
Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
In January 2017 China's National Energy Administration proposed for suspension over 100 planned and under-construction coal power projects in 13 provinces, including Huadian Laizhou. The NEA proposed the projects included be postponed to the 14th Five Year period (2021-2025).[6]
For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
Construction ongoing
Based on Planet satellite data from August 2017 to November 2018 construction has continued on the power station. A January 2018 news article confirmed construction was ongoing, with operation planned for 2019.[7] This appears to violate NEA Electricity [2016] 275, which suspended construction that began in 2016 or later in all provinces that have a red light under the traffic light system, which includes Shandong.
Unit 3 was commissioned in August 2019.[8]
Unit 4 was commissioned in November 2019.[9]
Project Details
- Sponsor: China Huadian (75%), Shandong Development Investment Holding Group (25%)
- Location: Haibeizui Village, Jincheng Town, Laizhou Couny, Yantai Prefecture, Shandong Province, China
- Coordinates: 37.432222, 120.018056 (exact)
- Status: Operating
- Gross capacity: Units 1-2: 2,078 MW (2 x 1,039 MW); Units 3-4: 2,000 MW (2 x 1,000 MW)
- Type: Ultra-Supercritical
- Start year: 2012 (Units 1 & 2), 2019 (Units 3 & 4)
- Coal type: Bituminous
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "Coal-Fired Plants in China - Shandong - A to M," Industcards, accessed November 2014
- ↑ "华电莱州电厂2×1000MW级机组工程获核准," 2010年02月04日
- ↑ "华电莱州电厂二期计划“十二五”内开工建设," Jiadong.net, March 31, 2014.
- ↑ "华电莱州二期(2×1000MW)清洁高效火电项目获核准," 2015-09-15
- ↑ "诚信在线华电莱州发电有限公司二期2×1000MW超超临界机组工程诚信在线泵及废水回收水泵等设备二次招标," 中国诚信在线处理工程网, 2018-3-28
- ↑ "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017
- ↑ "华电国际打造“智慧电厂”样本 莱州电厂实现废水零排放," 证券日报, 2018年01月24日
- ↑ "华电莱州发电3号1000MW发电机组完成168试运," 北极星电力网新闻中心, 2019/8/27
- ↑ "[中国能源网:华电莱州第四台百万机组顺利投产 - 中国华电集团,"] China Huadian website, Nov 14, 2019