Huadian Shaowu power station (华电邵武发电厂) is a 1,320-megawatt (MW) coal-fired power plant in Fujian Province, China.
Contents
Location
The map below shows the plant, in Shaowu City, Nanping Prefecture, Fujian Province.
Background on Plant
Shaowu power station was a two-unit coal-fired power plant with a total capacity of 250 MW. The plant was completed in 1998 and retired in 2015. It was owned by Fujian Huadian Power Company Limited of China Huadian.[1]
Background on expansion project
A new 1,320 MW power station has been proposed by China Huadian's Fujian Huadian Power at the site.[2] The feasibility report was submitted in 2013.[3]
Construction began in October 2015.[4]
2017: Plant postponed by government
In July 2017 China's NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[5]
Huadian Shaowu power station Units 3-4 are among the postponed coal-burning units,[5] and also appeared on an updated list of postponements released in September 2017.[6]
For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.
2018: Construction ongoing
Satellite imagery from Planet shows construction was ongoing at the power station from October 2017 through March 2018. An April 2018 news report verifies that construction has been ongoing on unit 3, which is planned for commissioning by the end of May 2018.[7]
Unit 3 was connected to the grid on September 28, 2018,[8] and commissioned in October 2018.[9]
Unit 4 was commissioned in May 2019.[10]
Plant Details
- Sponsor: Fujian Huadian Power Company Limited
- Parent company: China Huadian
- Location: Yao Village, Shuibei Town, Shaowu City, Nanping Prefecture, Fujian Province, China
- Coordinates: 27.3866923, 117.4607848 (exact)
- Status: Retired (2015)
- Gross capacity: 250 MW (Units 1 & 2: 125 MW)
- Type: Subcritical
- In service: 1998
- Coal type:
- Coal source:
- Source of financing:
Project Details for Expansion
- Sponsor: Fujian Huadian Power Company Limited
- Parent company: China Huadian
- Location: Shaowu City, Nanping Prefecture, Fujian Province, China
- Coordinates: 26.65, 118.183333 (approximate)
- Status: Operating
- Gross capacity: 1,320 MW (Units 3 & 4: 660 MW)
- Type: Ultra-Supercritical
- Projected in service: 2018 (Unit 3), 2019 (Unit 4)
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "福建华电邵武发电有限公司三期2×660MW项目烟囱内部电梯采购及安装竞争性谈判公告," 2016-6-1
- ↑ "福建华电邵武电厂三期工程环境影响评价报告书全文公示," Shaowu Bureau of Environmental Protection, Sep. 1, 2014
- ↑ "福建华电邵武三期2×660MW工程可行性研究报告通过审查," China Power, December 27, 2013
- ↑ "安徽电建一公司承建的华电邵武电厂三期工程正式开工," 安徽电建一公司, 2015-10-19
- ↑ 5.0 5.1 "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
- ↑ "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
- ↑ "华电邵武发电公司为5月30日实现3号机组投产加油," 邵武新闻网, 2018-04-02
- ↑ "中国能建承建福建邵武电厂2台66万千瓦超超临界燃煤发电机组并网发电," 北极星电力网新闻中心, 2018/9/28
- ↑ "邵武三期工程#3机组168小时满负荷试运行一次成功," chd.com.cn, 2018-10-30
- ↑ "闽北地区唯一大型火电厂邵武三期#4机组顺利通过168小时满负荷试运行," BJX, 2019-05-31