Huaneng Luntai power station (华能轮台热电分公司) is a 700-megawatt (MW) coal-fired power plant in Xinjiang Uyghur Autonomous Region, China.
Contents
Location
The undated satellite photo below shows the power station in Layisu.
Loading map...
Background on Project
China Huaneng is currently building a two-unit coal-fired power plant with a total planned capacity of 700 MW in Xinjiang Uyghur Autonomous Region. The plant is scheduled to be completed in December 2015.[1][2][3]
The power station was completed in 2016.[4]
Project Details
- Sponsor: Huaneng Xinjiang Energy Dev Co
- Parent company: China Huaneng
- Location: Layisu, Luntai county, Bayin'gholin Prefecture, Xinjiang Uyghur Autonomous Region, China
- Coordinates: 41.821533, 84.003586 (exact)
- Status: Operating
- Gross capacity: 700 MW (Units 1 & 2: 350 MW)
- Type: Supercritical
- In service: 2016
- Coal type: Bituminous
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "新疆四大电源项目获国家核准", 中国经济网兵团经济, 2013-06-20
- ↑ "华能轮台2×350兆瓦热电联产项目举行开工启动仪式", 中共新疆轮台县委县人民政府网, 2011-06-08
- ↑ "华能新疆能源开发有限公司轮台热电分公司招聘启事," 北极星火电招聘网, 2015年09月08日
- ↑ "华能轮台电厂2台35万千瓦热电联产工程1号机组顺利通过168小时试运行," 中国电力化工网点击, 2016-05-31