Jinchuan Group WP&RKA power station
Jump to navigation
Jump to search
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
This article is part of the CoalSwarm coverage of Indonesia and coal | |
Sub-articles: | |
Related articles: | |
Jinchuan Group WP&RKA power station is a 150-megawatt (MW) coal-fired power plant in Kawasi, Obi Islands, South Halmahera, North Maluku, Indonesia.[1]
Contents
Location
The satellite photo below shows the location of plant in Kawasi, Obi Islands, South Halmahera, North Maluku, Indonesia.
Loading map...
Background
The power plant is part of the Jinchuan ferronickel smelter.[2] Unit 1 was commissioned in May 2019 and Unit 2 was commissioned in June 2019.[2] Unit 3 was commissioned in September 2019.[3]
Project Details
- Sponsor: WP&RKA
- Parent company: Jinchuan Group
- Location: Kawasi, Obi Islands, South Halmahera, North Maluku, Indonesia
- Coordinates: -1.7982514,127.390572 (exact)
- Status: Operating
- Gross Capacity: 3 x 50 MW
- Type:
- In service: 2019
- Coal Type:
- Coal Source:
- Source of financing:
Articles and resources
References
- ↑ 印尼金川WP&RKA红土镍矿项目电炉炉盖、回转窑、干燥燃烧室、热风炉耐火材料采购招标公告, Nerin, Apr. 17, 2018
- ↑ 2.0 2.1 印尼金川WP公司产出第一炉镍铁, SMN, Jun. 3, 2019
- ↑ 中圣“一带一路”项目——印尼金川WP&PKA红土镍矿项目电厂工程1号机组并网发电一次成功, Sun Power, Sept. 24, 2019