Junliangcheng power station (华电天津军粮城发电厂五期) is a 1,050-megawatt (MW) coal-fired power plant in Tianjin Municipality, China.
Contents
Location
The map below shows the location of the plant, near Junliangcheng Town (Junliangchengzhen), Dongli District, Tianjin Municipality.
Background on Plant
Described as a "50-year-old plant," Junliangcheng power station now comprises two units, units 9-10, with a total capacity of 700 MW in Tianjin Municipality. The two units were built in 2010. The first eight units, commissioned from 1961 to 1993, have been retired. The plant is majority-owned by China Huadian.[1][2][3][4]
Proposed expansion
A 2 x 350 MW supercritical expansion is proposed to replace subcritical units 5-8 (totaling 840 MW).[5]
In August 2017 a 350 MW supercritical coal-fired heating unit and a 650 MW gas-steam combined cycle heating unit were permitted for construction. The coal unit is planned for construction in July 2017 and operation in October 2018.[4] The second coal unit therefore appears to be cancelled.
Planet satellite photos from June 2017 to April 2018 show construction on the new unit.
Both the coal and gas-fired units were commissioned in November 2019.[6]
Plant Details for Units 9-10
- Sponsor: China Huadian (51%), Tianjin Jinneng Investment Company (49%)
- Location: Junliangcheng Town (Junliangchengzhen), Dongli District, Tianjin Municipality, China
- Coordinates: 39.05313, 117.41226 (exact)
- Status: Operating
- Gross capacity: 700 MW (Units 9-10: 350 MW)
- Type: Subcritical
- Start date: 2010
- Coal type: Bituminous
- Coal source:
- Source of financing:
Project Details for Unit 11 Expansion
- Sponsor: China Huadian (51%), Tianjin Jinneng Investment Company (49%)
- Location: Junliangcheng Town (Junliangchengzhen), Dongli District, Tianjin Municipality, China
- Coordinates: 39.05313, 117.41226 (exact)
- Status: Operating (Unit 11), Cancelled (Unit 12 - will be gas-fired)
- Gross capacity: 350 MW
- Type: Supercritical
- Start date: 2019
- Coal type: Bituminous
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "华电军粮城发电公司9号机组正式投入商业运营," SASAC, July 23, 2010
- ↑ "Junliangcheng Coal Power Plant China," Global Energy Observatory, accessed November 2014
- ↑ "军粮城之惑:一个热电厂的生存之道," China Energy News, 2 May 2012
- ↑ 4.0 4.1 "天津华电军粮城六期650MW燃气+350MW燃煤热电联产项目燃煤机组引风机设备招标公告," China Huadian, 2017/08/01
- ↑ "天津华电军粮城六期 650MW 燃气+350MW 燃煤热电联产项目环境影响报告书," Tianjin Municipality, June 2016
- ↑ "天津军粮城六期热电联产工程11号机组顺利完成168小时试运行," Huadian Heavy Industries, 2019-11-18