Kendari-3 power station

From SourceWatch
Jump to navigation Jump to search

Kendari-3 power station is a proposed 100 megawatt (MW) coal-fired power plant in Southeast Sulawesi Province, Indonesia.

Location

The map below shows the location of the plant in Tanjung Tiram, South Konawe, Southeast Sulawesi Province.

Loading map...

Background

According to a June 2015 report, Kendari-3 power station is a 2 x 50 MW coal plant proposed for Kendari in Southeast Sulawesi province. The project is currently in the land acquisition stage. The estimated cost is US$200 million. Construction is targeted for 2016, with completion targeted for 2018.[1][2]

The project had a groundbreaking ceremony in September 2016 and appears to have entered into substantial construction, though the 2017-2026 long-range plan still describes it as in the "procurement" stage rather than the "construction" stage. Projected commercial operating date (COD) is listed as 2019.[3][4] As of September 2017 construction was 56% complete.[5] In July 2018 PT Dian Swastatika Sentosa announced that construction was 90% complete.[6] In April 2019 Dian Swastatika announced that the plant was preparing to begin commercial operations.[7]

Project Details

  • Sponsor: Dian Swastatika Sentosa Power Kendari
  • Parent company: PT Dian Swastatika Sentosa Tbk, in turn a subsidiary of Sinar Mas Group
  • Location: Tanjung Tiram, South Konawe, Southeast Sulawesi, Indonesia
  • Coordinates: -4.0512916,122.6534484 (exact)
  • Status: Construction
  • Gross Capacity: 2 x 50 MW
  • Type: Subcritical
  • Projected in service: 2019
  • Coal Type:
  • Coal Source:
  • Source of financing: US$150 million from China Development Bank Corporation and US$50 million from the sponsor's internal cash[3]