La Luna power station

From SourceWatch
Jump to navigation Jump to search

{{#badges:CoalSwarm|Navbar-Colombiacoal}}La Loma power station is a proposed 1,125-megawatt (MW) coal-fired power plant in César, Colombia.

Location

The map below shows El Paso, Cesar Department, Colombia, where the plant will be built near the proposed La Luna coal mine.

Loading map...

Background

In July 2018, it was reported that UK-based Sloane Energy Group planned to build a coal plant in Cesar Department, Colombia. It will consist of three ultra-supercritical coal-fired units of 375MW each. Coal will be produced at Sloane's adjacent La Luna coal mine, where production will begin in late 2019. Sloane plans to award an engineering, procurement and construction contract by the end of 2018. It is planned for operation in 2022.[1] In June 2018 the National Environmental Licenses Authority (Anla) granted the project its environmental license.[2] The plant was permitted in September 2019 and construction is scheduled to begin in April 2020.[3]

Project Details

  • Sponsor: Sloane Energy Group
  • Parent company: Sloane Energy Group
  • Location: Cesar Department, Colombia
  • Coordinates: 9.6576076,-73.740011 (approximate)
  • Status: Permitted
  • Gross Capacity: 1,125 MW (Units 1-3: 375 MW)
  • Type: Ultra-supercritical
  • Projected in service: 2023[3]
  • Coal Type:
  • Coal Source: La Luna coal mine, Colombia
  • Source of financing: