Laowuji Waste Coal power station
This article is part of the CoalSwarm coverage of China and coal | |
Sub-articles: | |
Laowuji Waste Coal power station (国投盘江老屋基煤矸石发电厂) is a proposed 300-megawatt (MW) coal-fired power plant in Guizhou Province, China.
Contents
Location
The map below shows the location where the power station would be built at Duanjiang Town, Pan County, Liupanshui Prefecture.
Background on Project
In February 2009, SDIC and Panjiang Investment Holdings co-founded SDIC Panjiang Electricity Generation Co, with 55% owned by SDIC and 45% by Panjiang Investment Holding.[1] The goal of the company is to develop waste coal power plants in Panjiang and Shuicheng, the two mining areas in Liupanshui Prefecture. Plans included the 600MW Laowuji waste coal power station.[2]
In 2010, Guizhou Provincial DRC approved for SDIC Power Holdings to start preliminary work on a 2400MW of coal capacity in Panjiang and Shuicheng mining areas, including the 4 x 300 MW Panbei power station, the 2 x 300 MW Pan'nan power station, and the 2 x 300 MW SDIC Wangjiazhai power station. The first two units of Panbei power station went operation in 2013 and 2014.[3]
In the end of 2014, Laowuji Waste Coal power station was permitted by the provincial DRC. The capacity changed to 2x 150MW, with a 12MW back-up unit.[4]
In September 2016, Laowuji Waste Coal was seeking clearance for its EIA report changes, indicating it was under development. [5]
In February 2018, the Guizhou Development and Reform Commission (DRC) published a list of Key programs and Major Projects for the province's economic development in 2018, which will have priority for loans, land, and subsidies. There are five coal power projects on the list, not including Laowuji Waste Coal power station. Therefore, any immediate plans for this project appear to be shelved.
Project Details
- Sponsor: SDIC Panjiang Electricity Generation Co.
- Parent company: SDIC & Panjiang Investment Holdings
- Location: Duanjiang Town, Pan County, Liupanshui Prefecture, Guizhou Province, China
- Coordinates: 25.828748, 104.503708 (exact)
- Status: shelved
- Gross capacity: 300 MW (Units 1-2: 150 MW)
- Type:
- Projected in service:
- Coal type: Waste coal
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "转型引领新跨越—贵州盘江投资控股(集团)有限公司发展纪实"《 中国能源报 》, 2012-02-20
- ↑ "国投盘江发电有限公司人员招聘启事," BJX Jobs, 2009-03-11
- ↑ "国投华靖公司贵州煤矸石发电项目前期工作取得重要进展," SDIC, 2010-1-28
- ↑ "老屋基电厂上大压小热电联产动力车间项目通过省发改委核准"盘江股份网(www.pjgf.cn), 2015-01-26
- ↑ "贵州盘江精煤股份有限公司老屋基矸石发电厂老屋基煤电化循环经济项目变更环境影响报告书公示"EPA of Guizhou Province, 2016-09-05