{{#badges:CoalSwarm|Navbar-Chinacoal}}Luneng Baoqing Chaoyang power station is a proposed 5,200-megawatt (MW) coal-fired power plant in Heilongjiang Province, China.
Contents
Location
The map below shows the location of Chaoyang Township, the approximate location where the plant would be built in Baoqing County, Shuangyashan Prefecture, Heilongjiang Province.
Background on Project
SGCC's Luneng Group was planning to build a coal-fired power plant with a total planned capacity of 5,200 MW in Heilongjiang Province.[1][2][3]
In 2010 Luneng Group transferred its coal possessions, including coal power plants, to Guodian (State Grid). In 2012 Guodian transferred the coal assets to Shenhua Group Corporation.[4]
As of 2014 it appears the only power station Shenhua Group is pursuing is the 1200 MW Luneng Baoqing power station in Baoqing County.[5][6]
Project Details
- Sponsor: Shenhua Group
- Parent company:
- Location: Chaoyang Township, Baoqing County, Shuangyashan Prefecture, Heilongjiang Province, China
- Coordinates: 46.221, 132.367 (approximate)
- Status: Cancelled
- Gross capacity: 5,200 MW
- Type:
- Projected in service:
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ Ailun Yang and Yiyun Cui, "Global Coal Risk Assessment: Data Analysis and Market Research," World Resources Institute working paper, November 2012
- ↑ "十二五规划16大煤电基地项目" accessed June 2013
- ↑ "国网能源宝清发电厂(原鲁能宝清发电厂)新建工程环评变更补充第二次信息公示", 中国宝清, 2011-12-7
- ↑ "国网660亿煤电资产腾挪 神华接手," sina.com.cn, 2012/08/17
- ↑ "宝清县2014年政府工作报告," hlbaoqing.gov.cn, 2014-1-17
- ↑ "国家节能中心评审神华国能宝清发电厂新建工程," China ECC, 2014-07-29