Pangpangta Coal Mine
{{#badges:CoalSwarm|Navbar-Chinacoal}} Pangpangta Coal Mine (霍州煤电集团吕临能化有限公司庞庞塔煤矿) is located in the middle of Hedong Coalfield in Shanxi Province, China. It has an annual production capacity of 10 million tonnes(Mt) per year.
Contents
Location
The undated satellite photo below shows the coal mine located in Muguaping Village, Linxian County, Luliang, Shanxi Province
Coal Mine Background
Pangpangta Coal Mine was formerly named as Xianying Coal Mine of Linxian. It was built in 1967 and put into operation in 1975. It went through reconstruction and expansion in 1990 and had a production capacity of 2,100 tonnes per year. In 2003, Huozhou Coal Power Group reached an agreement with Linxian government to purchase Xianying Coal Mine. In 2009, Xianying Coal Mine was integrated with Zaolin Coal Industry Company which was also taken over by Huozhou Coal Power Group to increase the production capacity from 2,100 tonnes per year to 3Mt per year.[1]
In March 2019, the National Development and Reform Commission has ratified the development of Pangpangta Coal Mine with a production capacity of 10Mt/year.[2]
Project Details
- Sponsor: Huozhou Coal Power Group Lu Ling Eenergy and Chemical Co.
- Parent Company: Shanxi Coking Coal Group(57.89%), China Cinda Asset Management Co.(36.39%), China Construction Bank(4.16%), Others(1.56%)
- Location: Muguaping Village, Linxian County, Luliang, Shanxi Province, China
- GPS Coordinates: 37.998811,111.13841
- Status: Construction
- Production Capacity: 10 Mt/year
- Total Resource: 2193.54Mt[3]
- Minable Reserves: 893.51Mt
- Coal Type: Bituminous
- Mine Size: 103.25k㎡[4]
- Mine Type: Underground
- Start Year:
- Source of Financing:
Articles and resources
References
- ↑ "霍州煤电集团吕临能化有限公司庞庞塔煤矿与选煤厂环境影响报告书"生态环境部,2013/10
- ↑ "国家发展改革委关于山西离柳矿区庞庞塔煤矿项目核准的批复"国家发改委,2019/03/29
- ↑ "霍州煤电集团吕临能化有限公司庞庞塔煤矿与选煤厂环境影响报告书"生态环境部,2013/10
- ↑ "关于霍州煤电集团吕临能化有限公司庞庞塔煤矿与选煤厂环境影响报告书的批复"生态环境部,2014/11/15