Papua LNG Terminal (Total)

From SourceWatch
Jump to navigation Jump to search
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor and the Center for Media and Democracy.
Sub-articles:

Papua LNG Terminal (Total) is an LNG terminal in Central Province, Papua New Guinea.

Location

The terminal is planned for Caution Bay, Central Province

Loading map...

Project Details

  • Owner:
  • Parent: ExxonMobil (60%), Total SA (40%)
  • Location: Caution Bay, Central Province, Papua New Guinea
  • Coordinates: -9.3392748, 146.9872856 (exact)
  • Capacity:
  • Proposed Capacity: 5.4 mtpa, 0.76 bcfd
  • Status: Proposed
  • Type: Export
  • Trains: 2
  • Start Year: 2020[1]

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

The Total SA-led Papua LNG project in Papua New Guinea may export gas via Exxon Mobil Corp.’s existing PNG LNG facility to avoid the expense of building a new plant. According to ExxonMobil's InterOil, there is enough gas between the Elk-Antelope and P’nyang gas fields in Papua New Guinea to justify three LNG trains by 2023 to 2025, in addition to the existing two trains at PNG LNG. "The new trains could be for Papua LNG, PNG LNG or both combined. All those will be decided at a later time,” according to InterOil.[2]

The terminal would be 5 mtpa. Total will have a 40% stake.[3]

On July 21, 2016, ExxonMobil announced its intent to acquire InterOil of Papa New Guinea for US$2.5 billion.[4] On February 22, 2017, InterOil confirmed the completion of this transaction. [5] Front-end engineering design work is projected to start by early 2018, while the final investment decision is expected for the project by the beginning of 2019.[6]

In April 2019 Total and its partners ExxonMobil and Oil Search signed a gas agreement with Papua New Guinea defining the fiscal framework for the Papua LNG Project. The agreement allows the partners to enter the front-end engineering design (FEED) phase of study that will lead to the final investment decision in 2020.[7] The terminal will consist of two trains each with 2.7 mtpa capacity.[7]