Pench Thermal Power Project

From SourceWatch
Jump to navigation Jump to search

{{#badges: CoalSwarm|Navbar-Indiacoal}} Pench Thermal Power Project is a proposed 1,320 megawatt (MW) coal-fired power station in Madhya Pradesh, India.

Location

The map below shows the location where the plant will be built, according to the environmental report.

Loading map...

Background

The project is proposed by by Adani Pench Power Limited, a subsidiary of Adani Power. On its website Adani states that "the project is in advanced stage of development and the project is planned to be commissioned in the second year of the XIIth Five Year Plan."[1]

Construction activity of the project commenced in March 2010, over two years prior to the granting of environmental clearance.[2]

In December 2011, Adani Power said that it was putting 6,500 MW of capacity expansion projects on hold due to coal supply uncertainties. The plants on hold included Pench Thermal Power Project in Madhya Pradesh, Bhadreshwar Thermal Power Project (Adani) in Gujarat, and Dahej Thermal Power Project in Gujarat.[3]

The power station received environmental clearance in October 2012.[4]

Opposition and delays

The project's permitting was legally challenged in 2013 by villagers that would be affected by the project.[5]

Proceedings before the National Green Tribunal were stayed by the Supreme Court on 6 January 2014.[6]

In April 2014 it was reported that a barricade had been built on a public road between the residents of five villages including Chaunsara, and the Adani Pench Power Ltd (APPL), which was building a 1,320 MW power plant in the area.[7]

In November 2015 it was reported that five people were attacked while protesting the plant.[2]

As of June 2019 there has been no further development on the units and no signs of construction from satellite photos. The project appears to be abandoned.

Impacts

According to the Environmental Justice Atlas, "The Madhya Pradesh Electricity Board (MPEB) is in the process of transferring about 300 hectares of land it had acquired from farmers in 1986 to Adani. The water will be drawn from the Pench Diversion Project to be constructed at a cost of Rs 583.40 crore for irrigation purposes and reservation of water for the 500 mw generation plant which was to be developed by MPEB." As such there is resistance to this project for two reasons. "Firstly for the dam on Pench River. The proposed dam will affect about 31 villages and fully submerge about six villages (Over 5,607 hectare area will come under submergence. Secondly, issues related to land acquisition of APPL. For the new and proposed power plant local farmers are not ready to give their land. Another matter of concern is that, the plant will draw water from Pench river raising wildlife concerns owing to pollution in the long run [2]. Medha Patkar is also supporting Kisan Sangharsh Samiti (KSS), which is leading organization of the movement against the project."[8]

Project Details

Sponsor: Adani Pench Power Limited, a subsidiary of Adani Power
Location: Dhanora and Chausara villages, Chaurai and Chhindwara Tehsils, Chhindwara district, Madhya Pradesh, India[9]
Coordinates: 22.14, 79.141389 (exact)[9]
Status: Cancelled
Capacity: 1,320 MW
Type: Supercritical
Projected in service:
Coal: "Indigenous coal will be made available from nearly coal mines and the same will be transported to the project site by railway wagons.[9]
Estimated annual CO2:
Source of financing:
Permits and applications: Environmental clearance, India MoEF, Oct 16, 2012

Articles and resources

References

  1. "Power Generation" Adani Power, accessed July 2011
  2. 2.0 2.1 National Alliance of People’s Movements, "Attack On KSS Activists Fighting Against Adani Pench Power Project," Countercurrents.org, 16 November, 2015
  3. "Adani Power holds 6,500-Mw expansion," Business Standard, December 28, 2011
  4. Environmental clearance, India MoEF, Oct 16, 2012.
  5. "NGT admits application against Adani Pench Power Project filed by Medha Patkar, Aradhana Bhargava & farmers," NAPM Press release, July 12, 2013.
  6. Adani Pench Power Ltd v Medha Patkar and Others (judgment of 6 January 2014), Civil Appeal D.No(s) 21001 of 2013 before the Supreme Court of India
  7. "Adani plant pushes voters to mull NOTA option," Hindustan Times, Apr 8, 2014
  8. "Adani Power Plant, Chhindwara, MP, India" Environmental Justice Atlas, accessed April 2, 2014.
  9. 9.0 9.1 9.2 EIA Report Executive Summary: 2 x 660 MW Coal-Based Thermal Power Plant at Chhindwara, Madhya Pradesh, accessed February 2012