{{#badges:CoalSwarm|Navbar-Chinacoal}}Qinghai Minhe Cogen power station (青海铭德能源物流集团民和热电联产) is a proposed 700-megawatt (MW) coal-fired power plant in Qinghai Province, China.
Contents
Location
The map below shows the location of Minhe Hui and Tu Autonomous County, the approximate location where the plant would be built in Haidong Prefecture, Qinghai Province.
Background on Project
In 2010 it was reported that China Huaneng was planning to build a coal-fired power plant known as Huaneng People with a total planned capacity of 2,400 MW in Qinghai Province.[1]
In 2011 the power station was reported as 1200 MW.[2][3]
In 2015 the plant was reported as 2 x 350 MW and sponsored by Qinghai Mingde Energy Logistics Group.[4]
Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
In January 2017 China's National Energy Administration suspended over 100 planned and under-construction coal power projects with a total capacity of over 100GW in 13 provinces, including Qinghai Minhe. It is unclear when or if the projects will be revived.[5]
For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
Project Details
- Sponsor: Qinghai Mingde Energy Logistics Group
- Location: Chuankou Town, Minhe Hui and Tu Autonomous County, Haidong Prefecture, Qinghai Province, China
- Coordinates: 36.345179,102.785615 (approximate)
- Status: Shelved
- Gross capacity: 700 MW (Units 1 and 2: 350 MW)
- Type:
- Projected in service:
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ 华能青海分公司挂牌成立", 中国电力网, 2010-06-28
- ↑ "青海分公司:抓好“五结合” 促进“五带头”", 中国华能集团公司, 2011-08-10
- ↑ "青海分公司:立足企业实际贯彻省十二次党代会精神," China Huaneng, 2012年05月25日
- ↑ "民和县经济和商务局2015年计划实施工业项目," www.minhe.gov.cn, Mar 18, 2015
- ↑ "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017