Rayong Cup-4.1 power station

From SourceWatch
Jump to navigation Jump to search
Part of the Global Gas Plant Tracker, a Global Energy Monitor and Center for Media and Democracy project.

Rayong Cup-4 power station is a 48-megawatt (MW) gas-fired power plant under construction in Ban Chang, Ban Chang District, Rayong Province, Thailand.[1] It is also known as the Central Utility Plant Project 4.[2]

Location

The map below shows the exact location of the proposed power station in Ban Chang, Ban Chang District, Rayong Province, Thailand.

Loading map...

Background

The project will support industrial development locally.[2]

In their 2019 investor update, PTT called this effort "phase 1" of the CUP 4 expansion and stated that is 40% finished.[3] Phase 2 will likely involve polyols in some way.[4]

Project Details

  • Sponsor: Global Power Synergy Co Ltd.
  • Parent company: PTT Pcl
  • Location: Ban Chang, Ban Chang District, Rayong Province, Thailand
  • Coordinates: 12.705689, 101.100143 (exact)
  • Gross capacity (under construction): 48 MW
    • Combined-cycle unit: 48 MW (to start 2020)

Articles and Resources

References

  1. Corporate Presentation dbAccess2016 PTT Group Day (June 3rd 2016), GPSC Investor Relations website, accessed Dec 17, 2019
  2. 2.0 2.1 Central Utility Plant Project 4 (CUP-4), GPSC Project, accessed Dec 17, 2019
  3. PTT Investor Update, PTT website, Jan 2019
  4. Global Power Synergy, Credit Suisse website, Apr 20, 2016