SMC Ibabang power station

From SourceWatch
Jump to navigation Jump to search

{{#badges:CoalSwarm|Navbar-Philippinescoal}}SMC Ibabang power station is a proposed 600-megawatt (MW) coal-fired power station in Quezon Province, Philippines.

Location

The map below shows Ibabang Polo Barangay in Pagbilao Municipality, the approximate location where the plant would be built. The barangay is already the location of the coal-fired Pagbilao power station, which is currently being expanded.

Loading map...

Background on Plant

In July 2016, San Miguel Corporation (SMC) received initial clearance to study the construction of a 600 MW coal plant in Barangay Ibabang Polo, Pagbilao, Quezon.[1] The 4 x 150MW coal plant would be subcritical and was scheduled to become operational “no later than 2021.”[2]

In September 2018 SMC announced that it still intended to build the plant,[3] but listings by the Department of Energy show no progress on the project since July 2016.[4] In January 2019 the president of SMC wrote to Quezon province's Gov. David Suarez to ask for his help in getting the project approved by the Sangguniang Panlalawigan (SP).[5]

In August 2019 the Philippine Department of Energy (DOE) listed the project's target commissioning date as TBD, suggesting that it may be delayed beyond the previous date of 2021.[6]

Project Details

  • Sponsor: Central Luzon Premiere Power Corp. (CLPPC)
  • Parent company: San Miguel Corporation
  • Location: Ibabang Polo Barangay, Pagbilao Municipality, Quezon Province, Philippines
  • Coordinates: 13.904, 121.758 (approximate)
  • Status: Pre-permit development
  • Gross Capacity: 600 MW (Units 1-4: 150 MW)
  • Type: Subcritical
  • Projected in service: 2021
  • Coal Type:
  • Coal Source:
  • Source of financing:

Articles and resources

References

  1. "SMC’s 2 coal plants get initial clearance," Manila Standard, July 18, 2016
  2. Riza T. Olchondra, "SMC allots $4.2B for five new power plants," Philippine Daily Inquirer, May 18, 2016
  3. SMC Global cleared to conduct grid impact study for Negros coal plant, Manila Standard, Sep. 25, 2018
  4. 2018 Private Sector initiated power projects in Luzun (indicative) Philippine Department of Energy, 30 Sep., 2018
  5. SMC to set up big development projects in Quezon, Business Mirror, Jan. 17, 2019
  6. PRIVATE SECTOR INITIATED POWER PROJECTS (LUZON) COMMITTED, Philippine Department of Energy, 31 Aug., 2019