{{#badges:CoalSwarm|Navbar-Chinacoal}} Shanghaimiao Changcheng No.1 Coal Mine (上海庙矿区长城一号煤矿) is located in the territory of Otog Front Banner of Ordos, Inner Mongolia. The annual production capacity of it is designed to be 1.8 million tonnes(Mt) per year.
Contents
Location
The undated satellite photo below shows the coal mine located in Shanghaimiao Economic Development Zone, Otog Front Banner, Ordos, Inner Mongolia, China.
Coal Mine Background
The original Changcheng No.1 Coal Mine with a capacity of 0.6Mt/year was constructed and put into operation in 2008.[1] On March 18th 2019, the National Energy Administration approved the development of Changcheng No.1 Coal Mine with a production capacity upgraded from 0.6Mt/year to 1.8Mt/year.[2]
Project Details
- Sponsor: Otog Front Banner Great Wall Coal Mine Co.
- Parent Company: Shandong Energy (43.34%), Yingda International Trust Co. (21.66%), China Huadian (16.39%), others (18.61%)
- Location: Shanghaimiao Economic Development Zone, Otog Front Banner, Ordos, Inner Mongolia, China.
- GPS Coordinates: 38.268543,106.552558
- Status: Construction
- Production Capacity: 1.8 Mt/year
- Total Resources: 279.618Mt[3]
- Minable Reserves: 132.433Mt
- Coal Type: Bituminous(gas coal, fat coal, long flame coal, non-caking coal) [4]
- Mine Size: 16.02k㎡[5]
- Mine Type: Underground
- Start Year:
- Source of Financing:
Articles and resources
References
- ↑ "上海庙矿区长城一号煤矿改扩建工程获得核准"鄂托克前旗人民政府,2019/03/31
- ↑ "国家能源局关于内蒙古上海庙矿区长城一号煤矿改扩建工程项目核准的批复"国家能源局,2019/03/18
- ↑ "新矿内蒙古能源公司长城一矿及选煤厂产业升级改造项目环境影响报告书 "P.25, 道客巴巴,2017/04/18
- ↑ "上海庙经济开发区"鄂尔多斯市人民政府
- ↑ "新矿内蒙古能源公司长城一矿及选煤厂产业升级改造项目环境影响报告书 "P.21, 道客巴巴,2017/04/18