Shengli East No.2 Open Pit Mine
{{#badges:CoalSwarm|Navbar-Chinacoal}} Shengli East No. 2 Open Pit Mine (大唐国际发电股份有限公司胜利东二号露天矿) is located in the middle of Shengli Coalfield in Inner Monogolia, China. It is managed and operated by Inner Mongolia Datang International Xilinhaote Mining Co., a subcompany of China Datang Corporation.
Contents
Location
The undated satellite photo below shows the coal mine located in the northeast of Xilinhot, Xilin Gol, Inner Mongolia.
Coal Mine Background
Shengli East No. 2 Open Pit Mine is one of the 10 ten-million-ton scale surface coal mines of the National 11th Five-Year Plan for coal industry. The project includes three phases.
Project phase I, whose production capacity is 10 million tonnes(Mt), has completed construction and passed the national inspection in 2010.
Phase II is the expansion project based upon the phase I, having production capacity of 30 Mt per year. Project Phase II was approved by the National Development and Reform Commission(NDRC) in February 2011. [1]
Project phase III, which has not begun construction, is expected to have capacity of 60Mt per year. It will then become the largest surface mine in Asia.[2]
Project Details
- Sponsor: Inner Mongolia Datang International Xilinhaote Mining Co.
- Parent Company: China Datang
- Location: Northeast of Xilin Hot, Xilin Gol, Inner Mongolia, China
- GPS Coordinates: 44.06697, 116.22348(exact)
- Status:
- Phase I: Operating
- Phase II: Construction
- Phase III: Proposing
- Production Capacity:
- Phase I: 10 Mt/year
- Phase II: 30 Mt/year
- Phase III: 60 Mt/year
- Total Resource: 5,318.72 Mt[3]
- Minable Reserves: 3,970.02Mt
- Coal Type: Lignite
- Mine Size: 49.63 k㎡[4]
- Mine Type: Surface
- Start Year:
- Phase I: 2010
- Phase II:
- Phase III:
- Source of Financing:
Articles and resources
References
- ↑ "内蒙古胜利矿区胜利东二号露天煤矿二期工程通过核准," 发改委, 2011/02/28
- ↑ "胜利东二号露天矿:创下多个世界之最" 搜狐,2013/09/16
- ↑ "内蒙古大唐国际锡林浩特矿业有限公司胜利东二露天煤矿“6·25”运输事故调查报告" 内蒙古煤矿安全监察局, 2012/06/25
- ↑ "内蒙古大唐国际锡林浩特矿业有限公司" 中国大唐集团煤业有限公司官网