Shenhua Jiaozuo power station
{{#badges:CoalSwarm|Navbar-Chinacoal}}Jiaozuo power station (神华国能焦作发电厂) is a 1,320-megawatt (MW) coal-fired power plant in Henan Province, China.
Contents
Location of units 1-6
The undated satellite photo below shows the original power station, in Jiefang District, Jiaozuo Prefecture, Henan Province.
Location of units 7-8
The undated satellite photo below shows the newest units of the power station, in Jiefang District, Jiaozuo Prefecture, Henan Province.
Background on units 1-6
The plant was originally owned by Shenhua Group. Four coal-fired units of Jiaozuo power station of 220 MW each (880 MW total) were brought online between 1979 and 1986. They were retired from 2010 to 2015. Units 5-6 of 220 MW each were commissioned from 1991 to 1992 and were retired in 2015.[1][2]
Expansion, units 7-8
Shenhua said it would build two 660 MW ultra-supercritical coal-fired units at this plant, totaling 1,320 MW, to replace the four older units. Construction on the new units began in 2013.[3] The new units went online in 2015.[4][5]
Plant Details for Units 1-6
- Sponsor: Shenhua Guoneng Energy Group
- Parent company: Shenhua (now National Energy Investment Group)
- Location: Jianshe West Road, Jiefang District, Jiaozuo Prefecture, Henan Province, China
- Coordinates: 35.220028, 113.197117 (exact)
- Status: Retired
- Gross capacity: 1,320 MW (Units 1-6: 220 MW)
- Type: Subcritical
- Start year: 1979-1992
- Coal type:
- Coal source:
- Source of financing:
Project Details for Units 7 & 8 Expansion
- Sponsor: Shenhua Guoneng Energy Group
- Parent company: National Energy Investment Group
- Location: Jiefang District, Jiaozuo Prefecture, Henan Province, China
- Coordinates: 35.259935, 113.499044 (exact)
- Status: Operating
- Gross capacity: 1,320 MW (Units 7 & 8: 660 MW)
- Type: Ultra-supercritical
- Projected in service: 2015
- Coal type: Anthracite
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "焦作市“十大建设”能源建设专项行动计划", 河南省焦作市城乡规划管理局, 2014-2-21
- ↑ "河南省淘汰落后产能工作领导小组办公室公告2016年 第1号," Henan government, Jan 29, 2016
- ↑ "神华国能焦作电厂2×660MW上大压小异地扩建工程正式开工", 中国火力发电网, 2013-04-27
- ↑ "神华国能焦作电厂1号机组通过168小时试运行," 孙华 衡亚南, 2015-06-03