{{#badges:CoalSwarm|Navbar-Chinacoal}} Shenneng Korla power station (深能库尔勒发电公司), previously known as Guodian Korla power station, is a 700-megawatt (MW) coal-fired power station in Xinjiang province, China.
Contents
Location
The undated satellite photo below shows the plant in Korla.
Background on Plant
China Guodian proposed a power station of two units of 350 MW each for the city of Korla in 2011. The units were permitted in 2013 and went into construction in 2014.[1][2]
The plant was transferred to Shenneng Korla Power Co. of Shenzhen Energy in 2015.[3]
The units are planned for operation by 2017.[4] They are combined heat and power (CHP) plants for residential and industrial use.[5]
Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
In January 2017 China's National Energy Administration proposed the suspension of over 100 planned and under-construction coal power projects with a total capacity of over 100GW in 13 provinces, including Guodian Korla power station. It is unclear when or if the projects will be revived.[6]
For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
Construction ongoing
Construction continues on the plant, and as of mid-2017, appears near completion.[7]
2017: Power station commissioned
Unit 1 was commissioned on 24 August 2017,[8] and unit 2 in November 2017.[9]
Project Details
- Sponsor: Shenneng Korla Power Co.
- Parent company: Shenzhen Energy Group (66%), Xinjiang Bayin Asset Management (12%), Korla Asset Management (12%), Xinjiang Keda Construction Group (10%)
- Location: Korla city, Xinjiang province, China
- Coordinates: 41.664241, 86.263179 (exact)
- Status: Operating
- Capacity: 700 MW (2 x 350 MW)
- Start date: 2017
- Type: Supercritical
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "库尔勒经济技术开发区-国电4×350MW电厂项目稳步推进," 新疆招商网, 2014-09-19
- ↑ "国电库尔勒2×350MW热电联产项目正式开工建设," chemnet, July 31, 2014
- ↑ "深能集团国电库尔勒发电有限公司社会招聘启事," HDJob, July 15, 2015
- ↑ "国电库尔勒2×350MW热电联产项目开建," 巴州政府网 谢晓艳, 2015年08月04日
- ↑ "新疆库尔勒热电联产工程1、2号机组实现投产运营," 亚心网, 2017-11-23
- ↑ "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017
- ↑ "国电库尔勒热电项目1号汽轮机扣盖成功," Korla.gov, 2017-04-28
- ↑ "深能库尔勒热电联产项目1号机组首次并网发电成功," 巴音郭楞日报, 2017/8/30