Shin Boryeong power station

From SourceWatch
Jump to navigation Jump to search

{{#badges:CoalSwarm|Navbar-SouthKoreacoal}}Shin Boryeong (Poryong) power station (신보령화력) is a 2,000 megawatt (MW) coal-fired power station next to the existing Boryeong power station in Boryeong, Chungcheongnam-do, South Korea.

Location

The two units are located about one km to the south of the Boryeong power station, which was built between 1983 and 2008.

Loading map...

Older plant location

The undated satellite photo below shows the existing Boryeong power station in South Korea, about one km to the north of the new units.

Loading map...

Background on Boryeong power station

The Boryeong power station consists of 8 coal-fired units of 500 MW each, built from 1983 to 2008, for a combined capacity of 4,000 MW. The scrubbers on Units 3-6 were retrofitted in the late 1990s. It is owned by KOMIPO.[1]

Background on Shin Boryeong power station

Shin Boryeong power station units 1 and 2 are scheduled for completion in 2016-2017.[2]

Due to technical complications, unit 1 is postponed for commissioning to January 2017 and unit 2 to June 2017.[3]

On May 6, 2017, the power station was reported as 98% complete, with unit 1 planned for June and unit 2 in September.[4]

Unit 1 was commissioned on June 29, 2017.[5] Unit 2 began commercial operations in October 2017.[6]

Project Details of Shin Boryeong

  • Sponsor: Korea Midland Power (KOMIPO)
  • Location: Boryeong-shi, Chungchengnam-do, South Korea
  • Coordinates: 36.3846129, 126.4861697 (exact)
  • Status: Operating
  • Gross Capacity: Unit 1: 1,000 MW; Unit 2: 1,000 MW
  • Type: Ultra-supercritical
  • Projected in service: 2017
  • Coal Type: Bituminous/Sub-bituminous
  • Coal Source:
  • Source of financing: