{{#badges:CoalSwarm|Navbar-Chinacoal}} Shiyan Cogen power station (京能十堰热电公司) is a 700-megawatt (MW) coal-fired power station in Hubei Province, China.

Location

The undated satellite photo below shows the power station in Shiqiao Village, Zhangwan District.

Loading map...

Background on Project

Beijing Energy Group is building a 2 x 350 MW supercritical coal plant in Shiqiao Village, Zhangwan District. The project was permitted in December 2014. It is planned for operation in 2017.[1][2]

July 2017: Plant postponed by government

In July 2017 China's National Energy Administration (NEA) released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) are ordered to slow down the construction progress during 2017 to 2020, and are not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[3]

Shiyan Cogen power station Units 1-2 are among the postponed coal-burning units,[3] and also appeared on an updated list of postponed projects released in September 2017.[4]

For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.

2018: Construction continues

A November 2017 articles states that construction is ongoing at the power station, which is planned for operation in 2018.[5]

Unit 1 was commissioned in December 2018.[6]

Unit 2 was commissioned in March 2019.[7]

Project Details

  • Sponsor: Bejing Energy Shiyan Theremo Power Company
  • Parent company: Beijing Energy Group
  • Location: Shiqiao Village, Zhangwan District, Shiyan Prefecture, Hubei Province, China
  • Coordinates: 32.683566, 110.737906 (exact)
  • Status: Operating
  • Gross capacity: 700 MW (Units 1 & 2: 350 MW)
  • Type: Supercritical
  • Start year: Unit 1 (2018), Unit 2 (2019)
  • Coal type:
  • Coal source: Domestic
  • Source of financing:

Articles and resources

References

  1. "全省瞩目的京能十堰热电联产项目正式开工," 十堰市发改委 发布日期, 2015-03-03
  2. "京能十堰热电联产项目获核准," 十堰热电, 2014年12月16日
  3. 3.0 3.1 "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
  4. "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
  5. "京能十堰热电联产项目总投资过半: 明年冬季开始为城区供暖," Shiyan government, Nov 17, 2017
  6. [http://www.10yan.com/2018/1222/597875.shtml "京能十堰热电项目启动全面供暖 张维国宣布试运行圆满成功 陈新武罗元红王永亮等共同见证,"] 秦楚网, 2018-12-22
  7. "湖北工程公司京能热电联产工程2号机组一次性通过168小时试运行," 湖北工程公司, 2019-03-14