Shuangma No.1 Coal Mine
{{#badges:CoalSwarm|Navbar-Chinacoal}} Shuangma No.1 Coal Mine (神华宁夏煤业集团双马一矿) is a permitted coal mine located in Majiatan Mining Area of Ningdong Base in Ningxia Hui Autonomous Region. The annual production capacity of it is 4 million tonnes(Mt) per year.
Contents
Location
The undated satellite photo below shows the coal mine located in Majiatan Village, Yanchi County, Lingwu, Ningxia Hui Autonomous Region
Coal Mine Background
The Shuangma No.1 Coal Mine began its construction in February 2009. Until June 2015, it was approved by the National Energy Administration.[1] In December 2015, the Ningxia Hui Autonomous Region Development and Reform Commission approved the Shuangma No.1 Coal Mine to enter into the trial operation stage.[2]
In January 2019, the project has passed the final project inspection before being officially put into commercial operation.[3]
Project Details
- Sponsor: Shenhua Ningxia Coal Industry Group
- Parent Company: National Energy Investment Group (51%), Ningxia State-Owned Asset Operation Group (49%)
- Location: Majiatan Village, Yanchi County, Lingwu, Ningxia Hui Autonomous Region
- GPS Coordinates: 37.784465,106.846093
- Status: Operating
- Production Capacity: 4 Mt/year
- Total Resource:
- Minable Reserves: 564.58Mt[4]
- Coal type: Bituminous, anthracite [5]
- Mine Size: 68.2k㎡[6]
- Mine Type: Underground
- Start Year: 2019
- Source of Financing:
Articles and resources
References
- ↑ "宁夏马家滩矿区双马一矿项目通过核准"国家能源局, 2015/06/12
- ↑ "神宁煤业集团双马一矿及选煤厂建设项目通过质量认证"中国电力企业联合会,2016/07/18
- ↑ "双马一矿矿井及洗煤厂建设项目通过竣工验收"神华能源报, 2019/02/12
- ↑ "神华宁夏煤业集团有限责任公司双马一矿矿井及选煤厂建设工程环境影响报告书(简本)"Page7,道客巴巴,2015/01/05上传
- ↑ "宁东基地:蓄力宁夏跨越式发展"中国日报网,2013/08/09
- ↑ "神华宁夏煤业集团有限责任公司双马一矿矿井及选煤厂建设工程环境影响报告书(简本)"道客巴巴,2015/01/05上传