Tanjung Kidurong power station

From SourceWatch
Jump to navigation Jump to search
Part of the Global Gas Plant Tracker, a Global Energy Monitor and Center for Media and Democracy project.

Tanjung Kidurong power station is a 842-megawatt (MW) gas-fired power plant, currently under construction in the state of Sarawak, Malaysia.[1]

Block 1 of the project launched in November 2016 and is due for completion in mid-2020. Block 2 launched in August 2018 and is set for completion in early 2021.[2]

Location

The below satellite image shows the location of the power station, which will be located at the existing Tanjung Kidurong Power Station in Jalan Tanjung Kidurong, Sarawak, Malaysia.

Loading map...

Project Details

  • Sponsor: Sarawak Energy Bhd. (SEB)
  • Parent company: Sarawak Energy Bhd.
  • Location: Jalan Tanjung Kidurong, Sarawak, Malaysia
  • Coordinates: 3.2899, 113.0942 (exact)
  • Gross capacity (under construction): 842 MW
    • Combined-cycle unit: 421 MW (to start 2020)
    • Combined-cycle unit: 421 MW (to start 2021)

Articles and Resources

References

  1. Power Plant Projects Sarawak Energy, accessed November 2019
  2. "Engineering a Record-Setting Environment for Success at Tanjung Kidurong" GE ASEAN, Aug. 5, 2019.