{{#badges:CoalSwarm|Navbar-Chinacoal}}Tianfu North power station (天富集团石河子天富北发电厂) is a 1,320-megawatt (MW) coal-fired power plant in Xinjiang Uyghur Autonomous Region, China.
Contents
Location
The undated satellite photo below shows the power station in Northern Shihezi City.
Loading map...
Background on plant
Xinjiang Tianfu Thermoelectric and Shanghai Electric have proposed a power station of two units of 660 MW each for Northern Shihezi city.[1]
Construction began in October 2012, with a planned operation date of 2015.[2]
The power station was commissioned in December 2017.[3]
Project Details
- Sponsor: Xinjiang Tianfu Thermoelectric
- Parent company: Xinjiang Tianfu Group
- Location: Northern Shihezi City, Development Zone, Chemical and New Material Industrial Park, Xinjiang Uyghur Autonomous Region, China
- Coordinates: 44.440758, 86.094012 (exact)
- Status: Operating
- Capacity: 1,320 MW (Units 1-2: 660 MW)
- Type: Ultra-supercritical
- Start year: 2017
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "天富热电2×660MW级电厂项目签约奠基(图)," 证券时报, 2012-7-19
- ↑ "天富热电与上海电气集团签订 2×660MW 热电联产项目总承包合同," mei.net.cn, 2012-10-09