Background on Plant
The 400 MW coal fired power station (2 x 200 MW) is owned by Tianlong Mining. It has been in operation since 2013. The plants first four units totaling 59 MW were retired in 2016.[1][2]
Project Details
- Sponsor: Tianlong Mining (Xinjiang Dragon Mining)
- Location: Ganhezi Town, Fukang County, Changji Prefecture, Xinjiang Uyghur Autonomous Region, China
- Coordinates: 44.09982, 88.372069 (exact)
- Status: Operating
- Gross capacity: 400 MW (Units 5-6: 200 MW)
- Type: Subcritical
- Projected in service: 2013
- Coal type:
- Coal source: