{{#badges:CoalSwarm|Navbar-Indonesiacoal}} Timor-2 power station is a 2 x 50 megawatt (MW) coal-fired power plant proposed in East Nusa Tenggara, Indonesia.
Contents
Location
The 2017-2026 long-range plan shows the plant located on the southern tip of the West Timor island.[1]
Loading map...
Background on Plant
In the 2016-2025 long range plan, the project is shown at 2 x 50 MW. According to the plan, the project was previously 2 x 25 MW. It was delayed from 2022/23 to 2023/24.[2] The long-range plan for 2018-2027 delays the plant to some time after 2027.[3] In the 2019-2028 long-range plan Unit 1 is scheduled for 2027 and Unit 2 is not listed, suggesting that it is cancelled.[4]
Project Details
- Sponsor:
- Parent company:
- Location: East Nusa Tenggara, Indonesia
- Coordinates: -10.3573816, 123.4593101 (approximate)
- Status: Unit 1: Announced; Unit 2: Cancelled
- Gross Capacity: 2 x 50 MW
- Type: Subcritical
- Start date: 2027
- Coal Source:
- Source of financing:
Articles and resources
References
- ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2017-2026, PT PLN Persero, p. D-62
- ↑ “Rencana Usaha Penyediaan Tenaga Listrik, PT PLN (Persero), 2016-2025,” Kementerian Energi Dan Sumber Daya Mineral, June 2016, Table 6.11
- ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2018-2027, PT PLN Persero, Table 5.3, V-6
- ↑ Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2019-2028, PT PLN Persero, V-48