Timor-2 power station

From SourceWatch
Jump to navigation Jump to search

{{#badges:CoalSwarm|Navbar-Indonesiacoal}} Timor-2 power station is a 2 x 50 megawatt (MW) coal-fired power plant proposed in East Nusa Tenggara, Indonesia.

Location

The 2017-2026 long-range plan shows the plant located on the southern tip of the West Timor island.[1]

Loading map...

Background on Plant

In the 2016-2025 long range plan, the project is shown at 2 x 50 MW. According to the plan, the project was previously 2 x 25 MW. It was delayed from 2022/23 to 2023/24.[2] The long-range plan for 2018-2027 delays the plant to some time after 2027.[3] In the 2019-2028 long-range plan Unit 1 is scheduled for 2027 and Unit 2 is not listed, suggesting that it is cancelled.[4]

Project Details

  • Sponsor:
  • Parent company:
  • Location: East Nusa Tenggara, Indonesia
  • Coordinates: -10.3573816, 123.4593101 (approximate)
  • Status: Unit 1: Announced; Unit 2: Cancelled
  • Gross Capacity: 2 x 50 MW
  • Type: Subcritical
  • Start date: 2027
  • Coal Source:
  • Source of financing: