Weiqiao Zhanhua power station (魏桥集团沾化热电) is a 1,400-megawatt (MW) coal-fired power plant under development in Shandong Province, China.
Contents
Location
The map below shows the location of the project in Binhaixiang, Zhanhua County.
Background on Plant
Weiqiao Zhanhua power station is a 4 x 350 MW coal plant under development in Binhaixiang, Zhanhua County, by Shandong Weiqiao Group. Units 3-4 were commissioned in 2015,[1][2] and unit 2 in 2016, as shown in Google Earth. Unit 1 is still under development.
Plant suspended
In August and September 2017, China's central government Environmental Protection Inspection Group 3 (中央第三环境保护督察组) spent a month in Shandong Province, to inspect the province's environmental protection work. In its final inspection report, the Group found that Shandong Weiqiao Group illegally built 45 coal power units in Shandong since 2013.[3]
In May 2018, the Shandong Provincial government responded to the inspection report with a plan to address the wrongdoings. According to the province, 33 of Weiqiao's 45 illegal coal power plants had since completed the necessary procedures to receive environment clearance and continue operating; 12 of the plants did not complete any procedures and should stop construction and operation immediately. Among the 12 units, 4 units should stop construction, and 8 units should stop operation.[4]
Weiqiao Zhanhua power station Units 1-4 were among the units told to stop operation and development by the province.[5]
Shandong Weiqiao Group says regulation will lead to widespread lay-offs
In April 2018, Shandong Weiqiao Group and Xinfa Group responded to reports the central government planned to regulate captive coal plants by saying the regulations would lead to widespread lay-offs. According to the companies, the regulations will be met with 180,000 workers losing their jobs at Shandong Weiqiao Group, and 80,000 at Xinfa Group.[6]
Project Details
- Sponsor: Weiqiao Huihong New Material Co.
- Parent company: Shandong Weiqiao Group
- Location: Binhai Town, Zhanhua County, Binzhou prefecture, Shandong Province, China
- Coordinates: 38.081082, 118.065610 (exact)
- Status: Shelved (suspended in 2018)
- Gross capacity: 1,400 MW (Units 1-4: 350 MW)
- Type: Subcritical
- In service: 2015 (Units 3-4), 2016 (Unit 2)
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "山东一建中标沾化供热中心一厂一期2×350兆瓦工程," HLFDW.com, 2014-09-17
- ↑ "山东一建市场开发喜气洋洋," Power China, 2015-02-25
- ↑ "魏桥因自备电厂再遭点名 违规建设发电机组45台," Jiemian, 2018/05/31
- ↑ "山东省公开中央环境保护督察整改方案," China MEP, 2018年05月29日
- ↑ "滨州市中央环保督察反馈问题整改情况公示表(第三批)," Shandong Province MEP, July 2, 2018
- ↑ "“24万人下岗给你们看”!自备电厂或将迎来史上最严整治风暴," Sohu, 2018-04-23