{{#badges:CoalSwarm|Navbar-Chinacoal}}XPCC Shihezi Cogen-1 power station (新疆兵团农八师天山铝业自备电厂) is a 3,560-megawatt (MW) coal-fired power plant under development in Xinjiang Uyghur Autonomous Region, China.
Contents
Location
The photo below shows the power station in Shihezi Sub-Prefectural City, Xinjiang Uyghur Autonomous Region. (Shihezi is under the administration of the Xinjiang Production and Construction Corps.)
Background and Expansion
The first four units of the Shihezi Cogen power station, totaling 1,400 MW, were brought online between 2012 and 2013. The captive power plant is owned by Xinjiang Tianshan Aluminum.[1][2]
Expansion
In 2013 XPCC planned to build six additional units at the coal-fired power station, units 5-10, with a total additional capacity of 2,160 MW.[3][4][5][6][7]
In 2015 Units 9 and 10 were reported as under construction.[8][9]
Unit 9 was commissioned in 2016 and unit 10 in 2017.[10]
With no developments since 2015, units 5-8 appear to be cancelled.
Project Details
- Sponsor: Xinjiang Tianshan Aluminum
- Parent company: Shihezi Jinlong Energy Industrial Chain (37%), Shihezi Jinhui Energy Investment (10%), Other (53%)
- Location: Shihezi Sub-Prefectural City, Xinjiang Uyghur Autonomous Region, China
- Coordinates: 44.428094, 86.093609 (exact)
- Status: Operating (Units 1-4, Units 9-10), cancelled (Units 5-8)
- Gross capacity: 3,560 MW (Units 1-4: 350 MW; Units 5-10: 360 MW)
- Type: Subcritical (Units 1-4)
- Start date: 2013 (Units 1-2), 2014 (Units 3-4), 2016 (Unit 9), 2017 (Unit 10)
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "天山铝业3号机组点火一次成功", 河南省火电建设公司网, 2013-10-31
- ↑ "公司正式签订新疆天山铝业自备电厂二期工程 6台36万千瓦超临界空冷汽轮机主辅机制造合同", 哈尔滨汽轮机厂有限责任公司, 2012-10-22
- ↑ "新疆生产建设兵团农八师天山铝业有限公司自备电厂", 新疆生产建设兵团建设局(环保局), 2014-03-03
- ↑ "新疆农八师自备电厂项目顺利发电投产", 河南九冶建设有限公司, 2013-1-28
- ↑ 电解铝项目“疯狂”西进 已建项目85%未经核准", 新华财经, 2013-04-01
- ↑ "兵团科技局黄斌局长来八师调研天山铝业", 新疆生产建设兵团科技局, 2014-04-10
- ↑ "总厂签署重庆万州电厂,新疆天山铝业自备电厂磨煤机合同,总厂签署重庆万州电厂,新疆天山铝业自备电厂磨煤机合同", 中国能建, 2013-01-31
- ↑ "电解铝企业自备电优势还能维持多久," 2015-10-10
- ↑ "天山铝业自备电厂二期工程安装开始," 2015-04-01
- ↑ "天山铝业电厂二期工程10号机组顺利移交生产," CEEC, May 9, 2017