Xingtai Cogen power station
{{#badges:CoalSwarm|Navbar-Chinacoal}} Xingtai Cogen power station (建投能源邢台热电项目) is a 700-megawatt (MW) coal-fired power station in Hebei Province, China.
Contents
Location
The undated satellite photo below shows the power station in Xingtai.
Background on Project
Hebei Construction Investment Energy Investment Co. has proposed a co-generation coal-fired power station of 700 MW in the Industrial Park area of Xingtai City, Hebei Province. The power station is planned for operation by the end of 2016.[1] It received environmental clearance in 2015,[2] and began construction that year. Operation is planned for 2016.[3]
Unit 1 began operating in November 2016.[4] Unit 2 began operating in December 2016.[5]
Project suspended, then revived
July 2017: Plant postponed by government
In July 2017 China's National Energy Administration (NEA) postponed or halted 185 coal-burning units across 21 provinces, totaling nearly 107 gigawatts (GW). 114 coal units totaling 65 GW are postponed for consideration until after the end of the 13th 5-year plan, in 2020. In addition, 71 coal units totaling nearly 42 GW were halted indefinitely for regulation violations. NEA said its goal is to eventually suspend or halt 150 GW of coal capacity during the 13th 5-year plan (2016-2020).[6]
Xingtai Cogen power station Units 1-2 are among the postponed coal-burning units.[6] It is unclear if the units must suspend operations.
September 2017: Suspension lifted
After political negotiations, China's National Energy Administration (NEA) released an updated list of postponed and halted coal projects on September 26, 2017. The new list contained 151 units totaling 95 gigawatts (GW). Xingtai Cogen power station was no longer on the list, suggesting the plant is not suspended.[7]
For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.
Project Details
- Sponsor: Hebei Construction Energy Investment Company
- Parent company: Hebei Construction & Investment Group
- Location: Heguo Town, Nanhe County, Xingtai Prefecture, Hebei Province, China
- Coordinates: 36.969986, 114.624016 (exact)
- Status: Operating
- Gross capacity: 700 MW (Units 1&2: 350 MW)
- Type: Supercritical
- Projected in service: 2016
- Coal type:
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "河北建投能源投资股份有限公司(2015届毕业生)春季招聘信息," 2015-03-26
- ↑ "河北建投邢台热电联产工程环评获批," 2015年06月08日
- ↑ "河北建投能源投资股份有限公司(2015届毕业生)春季招聘信息," 2015-03-26
- ↑ "邢台热电公司1号机组168小时满负荷试运圆满成功," Hebei Construction & Investment Group, 2016-11-24
- ↑ "邢台热电2×350MW热电联产项目2号机组投产," 北极星电力网, 2017-01-05
- ↑ 6.0 6.1 "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
- ↑ "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12