Xinjiang Jinghe New Material Cogen Captive power station

From SourceWatch
Jump to navigation Jump to search

{{#badges:CoalSwarm|Navbar-Chinacoal}} Xinjiang Jinghe New Material Cogen Captive power station (新疆晶和源新材料公司动力站) is a proposed 120-megawatt (MW) waste heat power station in Xinjiang province, China.

An additional 2 x 350 MW was proposed but appears abandoned.

Location

The photo below shows the proposed location for the plant in Lotuoquanzi Town.

Loading map...

Background on Plant

Hongxing Captive power station is a proposed 4 x 30 MW flue gas heat plant in Lotuoquanzi Town. The plant is part of a silicon manufacturing plant project, and will use the waste heat from the coal-based manufacturing. Construction on the units began in December 2018, with operation planned for 2021.[1][2]

Expansion

There were plans for a phase II of 2 x 350 MW supercritical coal units at the location, to be implemented after the 4 x 30 MW units.[3][4]

However, in February 2019 Hongxing Heating Co listed its future plans at the plant as 3 x 100 MW, planned for the distant future. Plans for the 2 x 350 MW units appear abandoned.[5]

Project Details of expansion

  • Sponsor: Hongxing Heating Co
  • Parent company: Xinjiang Jingheyuan New Material Company
  • Location: Lotuoquanzi Town, Hami prefecture, Xinjiang province, China
  • Coordinates: 42.5377, 94.118 (exact)
  • Status: Construction (Units 1-4), Cancelled (Units 5-6)
  • Capacity: 820 MW (Units 1-4: 30 MW, Units 5&6: 350 MW)
  • Projected in service: 2021 (Units 1-4)
  • Type: Waste heat (Units 1-4), Supercritical (Units 5-6)
  • Coal type:
  • Coal source:
  • Source of financing: