Zunhua-2 power station (河北建投遵化热电联产项目) is a 700-megawatt (MW) coal-fired power plant under development in Hebei Province, China.
Contents
Location
The undated satellite photo below shows the plant in Zunhua City, Tangshan Prefecture. Planet satellite photos from November 2017 to November 2019 show construction progress.
Loading map...
Background on Project
Hebei Construction & Investment Group is currently planning to build a two-unit coal-fired power plant with a total planned capacity of 700 MW in Hebei Province.[1][2][3]
The project was permitted in January 2016.[4] Construction is planned to begin in December 2016. The units are planned to come online in 2018.[5]
Unit 1 was commissioned in July 2019.[6]
Project Details
- Sponsor: Hebei Construction & Investment Group
- Location: Zunhua City, Tangshan Prefecture, Hebei Province, China
- Coordinates: 40.0765209, 117.9789085 (exact)
- Status: Operating (Unit 1), Construction (Unit 2)
- Gross capacity: 700 MW (Units 2 x 350 MW)
- Type: Supercritical
- Projected in service: 2019
- Coal type: Bituminous
- Coal source:
- Source of financing:
Articles and resources
References
- ↑ "国电电力签约遵化2×350MW热电联产项目," 2011-5-19
- ↑ "国电电力签约遵化2×350MW热电联产项目", 中国国电, 2014-04-30
- ↑ "我市召开国电电力热电联产项目调度会议," 2015-05-12
- ↑ "投资35.67亿元 河北发改委核准国电电力遵化热电联产项目(附文)," 北极星电力, 2016/1/4
- ↑ "河北建投遵化热电联产工程EPC总承包合同签订," CEEC, 9-26-2016
- ↑ "河北建投遵化2×350MW热电联产工程1号机组通过168小时满负荷试运行," BJX, 2019/7/11