{{#badges: CoalSwarm|Navbar-Germanyandcoal}} '''Niederaussem power station''' is a 3,980-megawatt (MW) lignite-fired power station in the Bergheim Niederaussem/Rhein-Erft-Kreis circle, owned by [[RWE]].
  
'''Niederaussem Power Station''' is a lignite-fired power station in the Bergheim Niederaussem/Rhein-Erft-Kreis circle, owned by [[RWE]].  
+
==Location==
 +
The undated satellite below shows the plant in Bergheim.
 +
{{#display_point:50.996883, 6.667549|width=600|height=400|type=satellite|zoom=15}}
  
{{#display_point:50.993798,6.668872999999962|width=600|height=400|type=satellite|zoom=15}}
+
==Background==
 +
The plant consists of nine units totaling 3,980 MW. The first eight are subcritical units built between 1963 and 1974, and the ninth is a 1,012 MW ultra-supercritical unit commissioned in 2002.
  
==Background==
+
==Pollution==
The plant consists of nine units, which were built between 1963 and 2003. It has a total output capacity of 3,864 MW and a net capacity of 3,627 MW. According to the study ''Dirty Thirty'', issued in May 2007 by the World Wide Fund for Nature, Niederaussem Power Station is the third-worst power station in Europe in terms of the relation of energy efficiency to CO<sub>2</sub> emissions<ref>http://assets.panda.org/downloads/european_dirty_thirty_may_2007.pdf The ''Dirty Thirty'' report</ref>.
+
According to the study ''Dirty Thirty'', issued in May 2007 by the World Wide Fund for Nature, Niederaussem Power Station is the third-worst power station in Europe in terms of the relation of energy efficiency to CO<sub>2</sub> emissions<ref>http://assets.panda.org/downloads/european_dirty_thirty_may_2007.pdf The ''Dirty Thirty'' report</ref>.
  
 
==History==
 
==History==
Line 13: Line 16:
  
 
===Mid-1990s===
 
===Mid-1990s===
In the middle of the 1990s the output was again increased. In order to reach the limit values of the new environmental protection regulations, in 1986 the work for a flue gas desulphurating plant began. That work was completed in 1988. The flue gases are fed into scrubbers and cleaned by a lime water mixture. The cleaned and cooled exhaust gases are then warmed up to 75&nbsp;°C (167&nbsp;°F) again and carried by the chimneys to the outside air. During the flue gas purification, gypsum from the lime water mixture, which is processed beside the power station in Auenheim by the company Pro mineral, is produced.
+
In the middle of the 1990s the output was again increased. In order to reach the limit values of the new environmental protection regulations, in 1986 the work for a flue gas desulphurating plant began. That work was completed in 1988. The flue gases are fed into scrubbers and cleaned by a lime water mixture. The cleaned and cooled exhaust gases are then warmed up to 75°C (167;°F) again and carried by the chimneys to the outside air. During the flue gas purification, gypsum from the lime water mixture, which is processed beside the power station in Auenheim by the company Pro mineral, is produced.
  
 
===1997 to present===
 
===1997 to present===
Line 27: Line 30:
 
<references/>
 
<references/>
 
*[http://www.rwe.com/web/cms/de/60132/rwe-power-ag/standorte/braunkohle/kraftwerke/kw-niederaussem/ Kraftwerk Niederaußem] (de)
 
*[http://www.rwe.com/web/cms/de/60132/rwe-power-ag/standorte/braunkohle/kraftwerke/kw-niederaussem/ Kraftwerk Niederaußem] (de)
 +
 +
==Project Details==
 +
*'''Sponsor:''' RWE Power AG
 +
*'''Parent company:''' RWE AG
 +
*'''Developer:'''
 +
*'''Location:''' Bergheim, Rhein-Erft-Kreis, North Rhine-Westphalia, Germany
 +
*'''Coordinates:''' 50.996883, 6.667549 (exact)
 +
*'''Status:''' Operating
 +
*'''Capacity:'''  3,980 MW
 +
*'''Start date:''' 1963-1974 (Units A-H), 2002 (Units K)
 +
*'''Type:''' [[Subcritical]] (Units A-H), [[Ultra-supercritical]] (Unit K)
 +
*'''Coal Type:''' Lignite
 +
*'''Coal Source:''' Domestic
 +
*'''Source of financing:'''
  
 
===Related SourceWatch articles===
 
===Related SourceWatch articles===
Line 56: Line 73:
 
*[[South Africa and coal]]
 
*[[South Africa and coal]]
 
*[[United States and coal]]
 
*[[United States and coal]]
 
{{Reflist}}
 
  
 
{{wikipedia}}
 
{{wikipedia}}
  
[[Category: Proposed coal plants in Germany]][[Category: Existing coal plants in Germany]][[Category: Proposed coal plants in Europe]][[Category: Existing coal plants in Europe]]
+
[[Category: Existing coal plants in Germany]]
 +
[[Category: Existing coal plants in Europe]]

Revision as of 00:28, 10 April 2016

{{#badges: CoalSwarm|Navbar-Germanyandcoal}} Niederaussem power station is a 3,980-megawatt (MW) lignite-fired power station in the Bergheim Niederaussem/Rhein-Erft-Kreis circle, owned by RWE.

Location

The undated satellite below shows the plant in Bergheim.

Loading map...

Background

The plant consists of nine units totaling 3,980 MW. The first eight are subcritical units built between 1963 and 1974, and the ninth is a 1,012 MW ultra-supercritical unit commissioned in 2002.

Pollution

According to the study Dirty Thirty, issued in May 2007 by the World Wide Fund for Nature, Niederaussem Power Station is the third-worst power station in Europe in terms of the relation of energy efficiency to CO2 emissions[1].

History

Initial construction

In the autumn of 1960 the construction work for the blocks A and B (150 MW) began. The location was selected because of the possibility of an extension. The supply of brown coal was ensured by seams on a north-south course ("Garzweiler"). Before blocks A and B first produced power, the construction work for the first 300 megawatt power station block location in Niederaussem began. That block went on-line in the summer 1965. Between 1968 and 1971 three further power plants with improved technology were developed. With the building of the two 600 MW plants a large jump forward occurred. These plants were added to the grid in 1974. At that time the plants at Niederaussem produced a total of 2,700 megawatts.

Mid-1990s

In the middle of the 1990s the output was again increased. In order to reach the limit values of the new environmental protection regulations, in 1986 the work for a flue gas desulphurating plant began. That work was completed in 1988. The flue gases are fed into scrubbers and cleaned by a lime water mixture. The cleaned and cooled exhaust gases are then warmed up to 75°C (167;°F) again and carried by the chimneys to the outside air. During the flue gas purification, gypsum from the lime water mixture, which is processed beside the power station in Auenheim by the company Pro mineral, is produced.

1997 to present

With the building of the block brown coal power station with optimized equipment technology (BoA) a new chapter at the power station began; between 1997 and 2002 it was the most modern brown coal power station block of the world with a gross achievement of 1,012 megawatts (950 MW net) developed with a far higher efficiency (43%) than the other plants (as low as 31%). RWE invested 1,200 million Euros into the project. Beside the new power station block, whose building has a height of 172 metres (one of the tallest industrial buildings in the world), the largest cooling tower in the world (200 metres), which serves also as the chimney of this unit, had already been built. By these developments Niederaussem became one of the largest and most modern coal-fired power stations in the world. The official opening of the new block took place in summer 2002. In the presence of Wolfgang Clement, the then North Rhine-Westphalia Prime Minister, and Gerhard Schroeder, the then Chancellor of Germany (Federal Republic), the new power station went on to the grid.

Since 21 July 2006 RWE has spent €40 million building a fluidized bed drying unit with waste heat technology (WTA) as a pilot project for the drying process of the raw brown coal. In addition the free waste heat of the power station is used. It is hoped that in the next few decades the overall efficiency of electricity production by brown coal can be increased to 50%.

2006 Fire

An incident in the power station Niederaussem occurred on 9 June 2006. At 1:15 a fire caught hold in block H of the coaling station. The fire spread to two further coaling station blocks. Later the flames seized nearly the entire area of the "old power station", and a large, black smoke cloud ascended, which spread many kilometres to the north-west. The power station's own fire brigade could not control the fire and sounded the alarm. About 300 rescue forces from the entire Land responded. The damage to property went into the two digit million-range.[citation needed] Even by the late evening of the next day the fire was not completely extinguished. The spread of the fire was contained by recently developed fire precautions in the other sectors of the power station so that only the coaling station was affected.

References

Sources

Project Details

  • Sponsor: RWE Power AG
  • Parent company: RWE AG
  • Developer:
  • Location: Bergheim, Rhein-Erft-Kreis, North Rhine-Westphalia, Germany
  • Coordinates: 50.996883, 6.667549 (exact)
  • Status: Operating
  • Capacity: 3,980 MW
  • Start date: 1963-1974 (Units A-H), 2002 (Units K)
  • Type: Subcritical (Units A-H), Ultra-supercritical (Unit K)
  • Coal Type: Lignite
  • Coal Source: Domestic
  • Source of financing: