Difference between revisions of "Dr. RKP Power Ankulapatur power station"
(Map Fix) |
m (Text replacement - "{{#badges:" to "{{Show badges|") |
||
(11 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
− | {{ | + | {{Show badges| CoalSwarm|Navbar-Indiacoal}} '''Dr. RKP Power Ankulapatur power station''' is a proposed 420-megawatt (MW) coal plant in Andhra Pradesh, India. |
− | |||
− | '''Dr. RKP Power Ankulapatur power station''' is a proposed coal plant in | ||
==Location== | ==Location== | ||
− | The map below shows the location of Chillakur | + | The map below shows the location of Chillakur taluk, district of Nellore, the approximate location where the plant would be built. |
{{#display_point:14.130902, 79.864683|width=500|height=400|type=normal|zoom=6}} | {{#display_point:14.130902, 79.864683|width=500|height=400|type=normal|zoom=6}} | ||
==Background== | ==Background== | ||
− | + | On its website, project proponent [[Dr. RKP Power]] said it has identified land for acquisition and has engaged a consultant to prepare an environmental assessment and apply for a Terms of Reference from the Ministry of Environment and Forests, the first stage in permitting.<Ref>[http://www.rkppower.com/ Dr. Ramakrishna Prasad Power Private Limited,] Dr. RKP Power company website, accessed January 2012</ref> | |
+ | |||
+ | In 2014 it was reported the company had completed a public hearing for the 120 MW plant, and applied for environmental clearance from the Union ministry of environment and forests.<ref>[http://www.telegraphindia.com/1140111/jsp/odisha/story_17773937.jsp#.U-QqO0j19ih "Villagers back power plant,"] The Telegraph, Jan 11, 2014.</ref> Activists say the pubic hearing should be redone because residents that would be affected by the plant were kept away.<ref>[http://www.thehindu.com/todays-paper/tp-national/tp-otherstates/jsm-wants-public-hearing-on-proposed-power-plant-again/article5581086.ece "JSM wants public hearing on proposed power plant again,"] The Hindu, Jan 16, 2014.</ref> | ||
+ | |||
+ | With no updates since January 2014, the project appears to be deferred or abandoned. | ||
==Project Details== | ==Project Details== | ||
'''Sponsor:''' [[Dr. RKP Power]]<br> | '''Sponsor:''' [[Dr. RKP Power]]<br> | ||
− | '''Location:''' | + | '''Location:''' Ankulapattur village, Chillakur mandal, Nellore district, Andhra Pradesh.<br> |
'''Coordinates:''' 14.130902, 79.864683 (approximate)<br> | '''Coordinates:''' 14.130902, 79.864683 (approximate)<br> | ||
− | '''Status:''' | + | '''Status:''' Cancelled<br> |
− | + | '''Capacity:''' | |
+ | *Phase 1: 120 MW (2 x 60 MW) | ||
+ | *Phase 2: 300 MW (2 x 150 MW) | ||
'''Type:''' <br> | '''Type:''' <br> | ||
'''Projected in service:''' <br> | '''Projected in service:''' <br> | ||
Line 25: | Line 29: | ||
==Articles and resources== | ==Articles and resources== | ||
===References=== | ===References=== | ||
− | {{reflist | + | {{reflist}} |
===Related SourceWatch articles=== | ===Related SourceWatch articles=== |
Latest revision as of 16:06, 25 December 2019
This article is part of the Coal Issues portal on SourceWatch, a project of Global Energy Monitor and the Center for Media and Democracy. See here for help on adding material to CoalSwarm. |
Dr. RKP Power Ankulapatur power station is a proposed 420-megawatt (MW) coal plant in Andhra Pradesh, India.
Contents
Location
The map below shows the location of Chillakur taluk, district of Nellore, the approximate location where the plant would be built.
Background
On its website, project proponent Dr. RKP Power said it has identified land for acquisition and has engaged a consultant to prepare an environmental assessment and apply for a Terms of Reference from the Ministry of Environment and Forests, the first stage in permitting.[1]
In 2014 it was reported the company had completed a public hearing for the 120 MW plant, and applied for environmental clearance from the Union ministry of environment and forests.[2] Activists say the pubic hearing should be redone because residents that would be affected by the plant were kept away.[3]
With no updates since January 2014, the project appears to be deferred or abandoned.
Project Details
Sponsor: Dr. RKP Power
Location: Ankulapattur village, Chillakur mandal, Nellore district, Andhra Pradesh.
Coordinates: 14.130902, 79.864683 (approximate)
Status: Cancelled
Capacity:
- Phase 1: 120 MW (2 x 60 MW)
- Phase 2: 300 MW (2 x 150 MW)
Type:
Projected in service:
Coal Type:
Coal Source:
Estimated annual CO2: 768,781 tons[4]
Source of financing:
Articles and resources
References
- ↑ Dr. Ramakrishna Prasad Power Private Limited, Dr. RKP Power company website, accessed January 2012
- ↑ "Villagers back power plant," The Telegraph, Jan 11, 2014.
- ↑ "JSM wants public hearing on proposed power plant again," The Hindu, Jan 16, 2014.
- ↑ For estimation method, see Estimating carbon dioxide emissions for proposed coal plants in India